Cass Subdivison Draft 16June2022FULL
Laserfiche
>
Public
>
Planning Commission
>
2022
>
Cass Subdivison Draft 16June2022FULL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2022 2:40:26 PM
Creation date
6/22/2022 2:40:19 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
June 16, 2022 <br />116 <br /> <br /> *Source: U.S. Greenberg, M., G. Belnay, W. Cesanek, N.Neuman and G. Shepherd. 1979. A primer on <br />industrial environmental impact. Center for Urban Policy Research. New Brunswick, NJ:116. <br />‡Source: Hittman Associates, Inc. 1969. Forecasting municipal water requirements. Columbia, MD. <br /> <br />3. Major subdivisions required to connect a municipal water supply system shall design a water <br />supply system pursuant to the following or to the standards and specifications of <br />municipality supplying the water: <br />a. The water supply system shall be adequate to handle the necessary flow based on <br />complete development.
The URL can be used to link to this page
Your browser does not support the video tag.