Laserfiche WebLink
CONTRACT APPROVAL <br /> SUGGESTED MOTION: Move to approve the following contracts submitted by respective department head, subject <br />to State’s Attorney approval, and authorize the Chairman to sign. <br /> Received as of June 1, 2022: <br />- Kadrmas, Lee, and Jackson, Inc.—hydraulic studies for the design of future bridges in Everest Township and Hunter Township <br />- Houston Engineering, Inc.—engineering services for the detailed design of the <br />phase 1 reconstruction of 36th Street Southeast in preparation to transition the roadway into a County Road for the Casselton soybean crushing facility