Laserfiche WebLink
<br /> ---.- <br /> CASS COUNTY <br /> 10.Ju.-07 <br /> 2008 Construction Project Options <br />I. Project Nol Year Paved or Estlmeted <br />Type of Work Project location length last overlaid Total Cost Federal Aid Construction Year and Notas <br />Asphalt overlay and , <br />Intersection Imorovemenls Hwy. 17 - 52nd Ave. to Hwv 16 6.00 1989 $3,000,000 $0 2008 <br />Asphalt overlav Hwy. 6 - Hwv 17 to Shevenne River .8 mile 1989 $150,000 $0 2008 <br />Asphalt resurface Hwv26 at Perlev Bridge 1.00 1988 $250,000 $0 2008 med to Perlev Bridge replacement) <br />Asphalt Overlay Hwv 31 from Hwv 26W to Hwv 26E 2.00 1986 $300 000 $0 2008 med to Perley Bridge replacement) <br />Asphalt Overlav Hwv 26 from Hwv81 to Hwv31N 6.51 1986 $980,000 $0 2006 med to Perley Bridge replacement) <br /> 2008 - (may need to do minor work In West <br />Asphalt overlay I Hwv 10- Mapleton to West Farao 6.00 1992 $1 700000 $1 360 000 Farno this vear <br />Asphalt overlay IHwv4- State 18 to Hwv5 N 8.00 1992 $1,000,000 $800 000 2009 <br />Asohalt Overlay (thin) Hwy 81 from Grandin to Hwv 34 11.50 1991 $1,000000 $0 ? (could be tied to C26 pro'ects above) <br />Asphalt Overlav I Hwy 5 from Absaraka to 194 8.00 1990 $1 200 000 ? <br />Asphalt Overlav Hwv 32 at Absaraka 1.50 1990 $225,000 ? <br />Asphalt Overlay Hwv 5 from 194 to Hwv 6 7.00 1888 $1,000,000 ? <br />Asphalt Overlay Hwv 8 from Hwv 1 to Hwv 38 8.00 1994 $900,000 ? <br />Asphalt Overlay Hwv 7 from 194 to Hwv 6 7.00 1993 $640,000 ? <br />IAsPhalt Overlay Hwv 9 from 194 to Hwv Duro'n 5.00 1993 $600 000 ? <br />Total Overlay Costa $13,145000 ? <br />Grade and ASPhalt Surface Hwv 16 - Davenport to State 18 8.00 NA 5 - 6 Million ? <br />