d. Contract approval
Laserfiche
>
Public
>
County Commission
>
2007
>
07-02-2007
>
Consent agenda
>
d. Contract approval
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2007 9:02:43 AM
Creation date
6/26/2007 2:08:41 PM
Metadata
Fields
Template:
Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CASS COUNTY HIGHWAY DEPARTMENT <br />CONTRACT <br /> <br />This agreement made and entered into by Cass County, North Dakota, party of the first part, and <br />Dakota Underground. 4001 - 15th Avenue NW. Fargo. ND 58102 party of the second part (hereinafter called Contractor), <br />WITNESSETH: <br /> <br />1. That for and in consideration ofthe payments to be made by the party of the first part, the contractor promises and agrees to <br />furnish and deliver all labor, equipment, and materials, and to payor cause to be paid as they become due, all claims for any work, labor, <br />materials, equipment, including equipment rental or repair, and other supplies or insurance premiums, all of which are attributable to or <br />utilized in and about the improvement and construction of Project No. MS070 1. In accordance and in confonnity with the provisions of <br />this contract and bond, the project proposal, the standard specification, supplemental specifications, special provisions, and the limits of <br />the project as shown in the plans approved by Cass County's Engineer March 20,2003, a length of N/A miles, the originals of which <br />are on file at the Cass County Highway Department, and all of which are hereby made a part of this agreement as fully and to the same <br />effect as if the same had been set forth in the body ofthis agreement. References in the Standard Specifications for Road and Bridge <br />Construction, 2002 edition, to the North Dakota Department of Transportation or Department must be construed as referring to the <br />owner. Likewise, a reference by the same works to engineer or director must be construed as referring to the owner ofthe project. <br /> <br />2. The party of the first part agrees and promises to pay to the Contractor for said work, when completed and accepted in <br />accordance with the provisions of this contract, the price set forth in the said proposal, amounting approximately to <br />One Hundred Seventy-six Thousand Two Hundred Fifty-one and 60/100 ($ 176.251.60), payments to be made as provided in said <br />specifications upon presentation of the proper certificates of the County Engineer, or his representatives, and under the tenns of this <br />contract. <br /> <br />3. The said work shall be done in accordance with the tenns ofthis contract, and the laws of the State of North Dakota, under <br />direct supervision and to the entire satisfaction ofthe County Highway Department, subject at all times to the inspection and approval of <br />the engineer. <br /> <br />4. The decision of the engineer upon questions connected with the execution of this agreement or any failure or delay in the <br />prosecution of the work by the Contractor shall be final and conclusive. <br /> <br />5. In the employment oflabor, other things being equal, preference shall be given to honorably discharged Veterans of the <br />Anned Forces, and bona fide North Dakota residents, as detennined by NDCC Section 43-07-20. <br /> <br />6. The Contractor shall begin construction work when so ordered by the Cass County Highway Department and shall maintain <br />at all times thereon a maximum and efficient working force necessary to complete the work within the time established by this contract. <br /> <br />of <br /> <br />IN WITNESS THEREOF, the parties to this contract have set their hands and seal this <br />2007. <br /> <br />day <br /> <br />CASS COUNTY NORTH DAKOTA <br /> <br />Chainnan, Cass County Board of Commissioners <br /> <br />Contractor <br /> <br />WITNESS TO CONTRACTOR'S SIGNATURE <br /> <br />By <br /> <br />Title <br /> <br />l:IADMIN-ENG\COMMISSION CORRSP\2007 COMMISSION CORREPONDENCE\CONTRACT MS0701 SHOP PAR.KING LOT DAKOTA UNDERGROUND. DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.