Laserfiche WebLink
The total estimated project cost is $850,000. A significant portion of the project cost is due to the <br />requirement of installing sand fill to replace the soil removed in the area of the slope failure. This was <br />a recommendation from the geotechnical report that was prepared by Braun Intertec. The City of <br />Casselton is respectfully requesting $637,500 of funding assistance, which is 75% of the estimated <br />total project cost. However, any assistance received from the Cass County Flood Risk Reduction <br />funding is appreciated and will directly reduce the local share and cost to the city’s residents. We will <br />be coordinating the project with the Maple River Water Resource District. <br />Please add this request to your next committee meeting for consideration. <br />Please contact me at 701-282-4692 or brandon.oye@mooreengineeringinc.com if you have any <br />questions or need additional information about the project. <br />Sincerely, <br />Brandon Oye, PE <br />City Engineer <br />Attachments <br />Cc: Sheila Klevgard – City Auditor, City of Casselton <br />Project Description: Swan Creek Diversion Slope Repair at Lagoon Cells 1 & 2 <br />Point of Contact: Brandon Oye (City Engineer), Moore Engineering Inc. <br />Estimated Project Cost: $850,000 <br />County Funding Requested: $637,500 (75% of total project cost) <br />Other Funding Sources: The City is also pursuing State Water Commission cost-share <br />Who will own and maintain: Joint between the Maple River Water Resource District and <br />the City of Casselton