Laserfiche WebLink
matches the drainage area from Cass County. The existing federal project maintenance district for all three <br />dams only provides a maximum of $41,880 combined each year, which severely limits the amount of <br />maintenance that can be completed at all three dams. <br /> <br />The above projected cost-share amounts are based on the WRD’s request for the RRJWRD to approve cost- <br />share that is above their current policy. The RRJWRD will decide at their April meeting on whether to <br />approve this increased cost-share amount. The local cost-share would increase to $500,150 if the RRJWRD <br />only funds at their policy level. If this occurs, the WRD may request additional cost-share from the Cass <br />County Flood Sales Tax Committee. <br /> <br />Upon completion of the design this year, the WRD will coordinate with the North Dakota Department of <br />Water Resources on obtaining a permit for the Project. Construction is anticipated in 2023. Enclosed with <br />this letter is a project map. <br /> <br />If you have any questions, please feel free to contact me or our Project Engineer, Lyndon Pease, Moore <br />Engineering, Inc., at 701-282-4692. <br /> <br />Sincerely, <br /> <br />ELM RIVER JOINT WATER RESOURCE DISTRICT <br /> <br />Jessica Spaeth <br />Treasurer <br /> <br />Enclosures: <br />Project Map <br />