2. Chrisan Glen riverbank slide issues
Laserfiche
>
Public
>
County Commission
>
2007
>
06-04-2007
>
Regular agenda
>
2. Chrisan Glen riverbank slide issues
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2007 5:06:47 PM
Creation date
5/29/2007 5:04:16 PM
Metadata
Fields
Template:
Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />'CASSCOlJN1Y <br />GOVERNMENT <br />..1... <br /> <br />Highway <br />Department <br /> <br />Keith n, Rcrndt, P.E. <br />County Engineer <br /> <br />Richard S. Sicg <br />Superintendent <br /> <br />Thomas B. Soucy, P.E. <br />Design and Clnstruction <br />Super\'isor <br /> <br />1201 West Main Avenue <br />P.O. l\.IX 098 <br />West Far~ll, Nonh DahlIa <br />58078-0698 <br /> <br />701-298-2H0 <br />Fax 701-298-2395 <br /> <br />RECEIVEL" <br /> <br />J:O( marCh 1 \ ;)Do 6 <br />u,mYhi JS )'0 Y1 Ylle&h~~ <br /> <br />FEB 2 8 2005 <br /> <br />CASS COUNTY COMMIS~I, ,1\ <br /> <br />MEMORANDUM <br /> <br />TO: Cass County Commission <br /> <br />FROM: Keith Berndt, Cass County Engineer ~ <br />DATE: February 25, 2005 <br /> <br />SUBJECT: Agenda Topic for March 7.2005 Meeting: <br />Chrisan Glen Slide Repair. <br /> <br />The subcommittee fonned to address the Chrisan Glen slide issue has met <br />several times in recent months, As a result of the meetings. I'm suggesting <br />a proposed solution. The repair would involve reshaping the bank, adding <br />some rip-rap (large rock) near the water, and planting some riparian <br />plantings. <br /> <br />I've been in contad with the administrators of a program called the <br />Riparian Project. This project has some Federal grant funding that could <br />provide 60% of the funding tor eligible work. <br /> <br />I've conservatively estimated a total cost of just over $14,000 to complete <br />the repairs. In addition, I've received an estimate ti'om Moore Engineering <br />to of $1 ,000 to complete a legal survey establish the property boundary. <br />I've enclosed a copy of the estimate with a SO/50 split oflocal costs <br />between the County and Mrs. Murphy. <br /> <br />If the above tonnula is used, The County cost would be S3,987. It is <br />uncertain as to if the Riparian Project will fund 60% of the rip-rap cost. If <br />they decided not to fund any of the rip-rap. the County's cost would be <br />about $5,900. <br /> <br />SUGGESTED MOTION: Authorize County Engineer to proceed with <br />Chrisan Glen slide repairs and legal survey as outlined. County Engineer <br />to coordinate with the Riparian Project. Local costs to be split with the <br />adjacent landowner on a SO/50 basis. COllnty costs excluding staff time not <br />to exceed $5,900. <br /> <br />J '\dmill.l:n!:d '''lIn11li.').~ifln ('Olhp :oo~ ( ,1I11mi~sinll ('mn.'~pl\l1dt'IIL''': '\~C,~t.1 "km, , \1,lh,'i. .. 1IIt."'-':P:!; - ('hrkm (j".'n.lIi~( <br />
The URL can be used to link to this page
Your browser does not support the video tag.