<br />MaY. 7. 2007 1 :08PM
<br />
<br />Cass County HighwaY Dept.
<br />CASS COUNTY mGHWAY DEPARTMENT
<br />CONTRACT
<br />
<br />No,5912
<br />
<br />p. 5/5
<br />
<br />This agreement made and entered into by Ca.~s C(lUnty, North Dakota, party of the first part, HTld
<br />Ma.t'k Sand & Gravel Company. PO 6()x 4?,~. F'erQ:us Falls. MN 56538 p..1J'ty of the second part (hereinafif;.'T called Contractor).
<br />WITNESSETH:
<br />
<br />1. That for and in conllideration ofthe payments to be made by the party of the tirst part, the contractm pnlmises and agrees to
<br />furnish and dcliwr all labor, equipment. and materials, and to payor cautlC to be paid a.':l they becc.lme due, all claims for any work, lahor,
<br />materials, equipment. including equipment rentalllrrepair, and other supplies or insurance pl'eOliums, all of which an: a\1ributable to or
<br />utilized in and about the improvement and construction of Project No. CH0707. In accordance and in conll.mnity with the provisions of
<br />this ellntTllct and bond, the project proposal, the standard specifieatiun, supplemelltlllspecific.'\tions, special provisions, and the limits (It"
<br />the project as shown in the plans approvcd by Ca.,:>s County's EngineecMarch 20 , 2003, a length of 7.423 miles, the originals of which
<br />are on file at the Cass County Highway Department, and all ofwhieh arc hereby made a plirt "fthis al:,lJ'eement as fully and to the !lame
<br />ellect as ifthe same had been set forth in the body of Lhis agreement. References in the Standard Specifications for, Road ~d Bridge
<br />Constmction, 2002 edition, to the North Dakota Department of Transportation or Department must be construed as referring to the
<br />owner. Likewise, a reference by the same works to engineer or dircctor must be c(mstrued a.':l referring to the owner of the project
<br />
<br />2. The party of the liTNt part iigrees and promises to pay to the Contractor for said work, when c(mlpleted and accepted in
<br />accnnlance with the provisions of this contract, the price set forth in the said propos.'ll, amounting approximately t~l
<br />Eight Hundred Twenty-one Thollsand N.ine H I,JI),dred N illety-five and 09/100. ($ 821.995.09 ). payments to be made as provided in said
<br />specifications upun presentation ofthe proper cert.ificates of the Coullly Engineer, or his representatives, and under the terms of this
<br />cnntract.
<br />
<br />3, The said work shaH be done in accordance with the terms of this contract, and the laws of the SUlt.e of North Uakota, under
<br />direct supervision and to the entire satisfaction lll'the County Highway Deportment, subject at all times to the inspection and approval of
<br />the engineer.
<br />
<br />4. The decision of the engineer upnn quesLions connected with the execution of1i1is agreement or any failure ~lr delay in the
<br />prosecution of the work hy the ContTactOT shan be final and conclusive.
<br />
<br />5, In the employment of labor, oLher things being equal, preference shall be given to honorably discharged Veterans of the
<br />Armed Forces, and h(Jna fide North Dakota residents, as detennined by NUCC Scctit)ll 43"()7-2().
<br />
<br />6. The Contractor shall begin construction work when 50 ordered by the Coss County Highway Department and shallmailltain
<br />at nil times thcrcon a ml1ximum and etlicient working force necessary to completc the work wiLhin the time established by this contract.
<br />
<br />IN W)'J'NESS THEREOF, Ihe parties tu this contract have set their hands and seal this
<br />of~_........ 7007.
<br />
<br />,_day
<br />
<br />CASS COUNTY NORTH DAKOTA
<br />
<br />-
<br />Chainnan, Cass County Roard of Conunissioners
<br />
<br />Contractor
<br />
<br />WITNESS TO CONTRACTOR'S SIGNATURE
<br />
<br />Ry ,
<br />
<br />Title
<br />
<br />J:,^nMIN-HN('~~Kl.lJH(:T~\C1l} UVIiJUAY ClIO ~Tll nmouolI DtJFFALOIr.ONTRACT POll MAliK MNIl.t (;KAvHI, fill(:
<br />
|