b. Hazard mitigation awareness grant
Laserfiche
>
Public
>
County Commission
>
2007
>
05-07-2007
>
Consent agenda
>
b. Hazard mitigation awareness grant
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2007 9:08:28 AM
Creation date
5/1/2007 9:06:31 AM
Metadata
Fields
Template:
Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />INSTRUCTIONS: <br /> <br />a. Press F1 for help for each field. <br />b. Navigate through the form by using the TAB key or the mouse to highlight and enter data in each field. <br />c. All Questions in RED are required. <br />d. Documents attached must be in version WORD 97 or above or WORDPERFECT 6.0 or above. <br /> <br />(R8-PA-5/1/2004) <br /> <br />-------------------------------------------------------------------------------------------- <br />-------------------------------------------------------------------------------------------- <br /> <br />>1. THE CONTRACTOR WILL CREATE A LEARNING PACKET FOR ELEMENTARY SCHOOLS ACROSS <br />THE STATE THAT WILL PROVIDE LESSON PLANS SPECIFICALLY GEARED TOWARD CHILDREN IN <br />GRADES 1-6 THAT FOCUS ON HAZARD AND THREAT AWARENESS, SAFE BEHAVIORS, <br />PREPAREDNESS ACTIVITIES AND MITIGATION PROJECTS.. THIS LESSON WILL SET THE <br />GROUNDWORK FOR STUDENTS' PARTICIPATION IN THE NORTH DAKOTA PREPARED! CALENDAR <br />POSTER CONTEST. <br /> <br />THE POSTER CONTEST WILL DEAL WITH SPECIFIC HAZARDS AND MITIGATION THEMES. TWELVE <br />WINNERS WILL BE CHOSEN IN EACH OF FOUR REGIONS IN THE STATE TO COMPRISE THE TWELVE <br />MONTHS OF ILLUSTRATIONS IN THAT REGION'S NORTH DAKOTA PREPARED! CALENDAR. THOSE <br />STUDENTS WHOSE ARTWORK IS SELECTED WILL RECEIVE AN AWARD AND FIVE COPIES OF THE <br />NORTH DAKOTA PREPARED! CALENDAR. TWELVE STUDENTS' ARTWORK WILL BE SELECTED IN <br />EACH OF THE FOUR REGIONS IN THE STATE. (CONTRACTOR HOURS ATTRIBUTED: 200) <br /> <br />2. THE CONTRACTOR WILL DISSEMINATE THE LEARNING PACKETS TO THE ELEMENTARY SCHOOLS <br />AND WILL MEET WITH REGIONAL EMERGENCY MANAGEMENT REGIONAL GROUPS TO ENLIST THEIR <br />ASSISTANCE IN THE PROMOTION OF THE NORTH DAKOTA PREPARED! CALENDAR PROJECT AND TO <br />GATHER INFORMATION THAT THE EMERGENCY MANAGERS FEEL IS IMPORTANT TO BE INCLUDED IN <br />THE CALENDAR. (CONTRACTOR HOURS ATTRIBUTED: 60) <br /> <br />3. THE CONTRACTOR WILL MEET WITH REPRESENTATIVES FROM THE NORTH DAKOTA DEPARTMENT <br />OF EMERGENCY SERVICES, UTILITY COMPANIES AND OTHER PERTINENT AGENCIES TO COLLECT <br />INFORMATION TO BE INCLUDED IN THE CALENDAR. (CONTRACTOR HOURS ATTRIBUTED: 80) <br /> <br />4. THE CONTRACTOR WILL SEEK AND RECEIVE FINAL APPROVAL FOR THE CALENDAR CONTENT <br />AND FORMAT FROM THE NORTH DAKOTA DEPARTMENT OF EMERGENCY SERVICES. (CONTRACTOR <br />HOURS ATTRIBUTED: 20) <br /> <br />5. THE CONTRACTOR WILL SOLICIT AND OBTAIN PRIVATE SECTOR SPONSORS WITHIN EACH REGION <br />TO SUBSIDIZE THE PUBLICATION AND DISTRIBUTION COSTS OF THE CALENDAR. THE CONTRACTOR <br />WILL ALSO SEEK TO LEVERAGE ANY OTHER GOVERNMENT MONIES AND PARTNERSHIPS AT THE <br />LOCAL, STATE AND FEDERAL LEVEL THAT WOULD ENSURE WIDER CALENDAR DISTRIBUTION. <br />(CONTRACTOR HOURS ATTRIBUTED: 740) <br /> <br />6. THE CONTRACTOR WILL EVALUATE CALENDAR DISTRIBUTION OPTIONS THAT WILL ALLOW FOR <br />THE MOST WIDESPREAD DISTRIBUTION OF THE CALENDARS AND WILL ENSURE THAT DISTRIBUTION <br />OPTIONS THAT ALLOW FOR THE LARGEST AND MOST MEANINGFUL DISTRIBUTION WILL BE <br />UTILIZED. (CONTRACTOR HOURS ATTRIBUTED: 80) <br /> <br />7. THE CONTRACTOR WILL EFFECTUATE DISTRIBUTION OF THE NORTH DAKOTA PREPARED! <br />CALENDAR ON OR BEFORE DECEMBER 8,2007. (CONTRACTOR HOURS ATTRIBUTED: 0) <br /> <br />BUDGET: <br />LEARNING PACKET SUPPLIES AND MAILING (217 X $10 A PACKET <br />MISC. COSTS AND SUPPLIES <br />OFFICE AND ADMINISTRATIVE COSTS (8 X 500) <br />CONTRACTOR TRAVEL (MILEAGE, LODGING, MEALS EST. 18 X 125) <br />CONTRACTOR HOURS (1,180 HOURS) <br /> <br />$2,170 <br />$1,000 <br />$4,000 <br />$2,250 <br />$14,750 <br /> <br />FED SHARE <br />STATE SHARE (10%) <br />LOCAi4SHARE (15%) <br /> <br />$24,170 <br />$18,128 <br />$ 2,417 <br />$ 3,625 <br /> <br />TOTAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.