Laserfiche WebLink
<br />INSTRUCTIONS: <br /> <br />a. Press F1 for help for each field. <br />b. Navigate through the form by using the TAB key or the mouse to highlight and enter data in each field. <br />c. All Questions in RED are required. <br />d. Documents attached must be in version WORD 97 or above or WORDPERFECT 6.0 or above. <br /> <br />(R8-PA-5/1/2004) <br /> <br />-------------------------------------------------------------------------------------------- <br />-------------------------------------------------------------------------------------------- <br /> <br />Categories for projected expenditures are: Project Management, Engineering & Design, <br />(explain in detail under Cost Estimate Comments below), Accounting, Legal, Site Acquisitions, <br />Labor, Materials & Supplies, Equipment, Staffing, Transportation, etc. (Contingencies and <br />administrative costs are NOT allowable costs). <br /> <br />A. Item name: ILEARNING PACKET SUPP. & MAIL 1 (i.e, Design & Engineering, lumber, etc.) <br /> <br />Unit QT: c:J Unit of Measure: ..... <br /> <br />Unit Cost: c:J <br /> <br />Cost Estimate: 12,1701 <br /> <br />B. Item name: ICOSTS & SUPPLlESI (i.e, Design & Engineering, lumber, etc.) <br /> <br />Unity QT: c:J Unit of Measure: ..... <br /> <br />C. <br /> <br />Item name: IOFFICE & ADMIN COSTsl <br /> <br />Unity QT: c:J Unit of Measure: ..... <br /> <br />D. <br /> <br />Item name: ITRA VE4 <br /> <br />(i.e, Design & Engineering, lumber, etc.) <br /> <br />Unity QT: c:J Unit of Measure: ..... <br /> <br />E. <br /> <br />Item name: IPERSONNEL HOURSI <br /> <br />Unity QT: c:JUnit of Measure: ..... <br /> <br />F. <br /> <br />Item name: c:J <br /> <br />(i.e, Design & Engineering, lumber, etc.) <br /> <br />Unity QT: c:JUnit of Measure: ..... <br /> <br />G. <br /> <br />Item name: c:J <br /> <br />(i.e, Design & Engineering, lumber, etc.) <br /> <br />Unity QT: c:J Unit of Measure: ..... <br /> <br />H. <br /> <br />Item name: c:J <br /> <br />(i.e, Design & Engineering, lumber, etc.) <br /> <br />Unity QT: c:J Unit of Measure: ..... <br /> <br />Unit Cost: c:J <br /> <br />Cost Estimate: 11,OO~ <br /> <br />(i.e, Design & Engineering, lumber, etc.) <br /> <br />Unit Cost: c:J <br /> <br />Unit Cost: c:J <br /> <br />Cost Estimate: 14,0001 <br /> <br />Cost Estimate: 12,2501 <br /> <br />(i.e, Design & Engineering, lumber, etc.) <br /> <br />Unit Cost: c:J <br /> <br />Unit Cost: c:J <br /> <br />Unit Cost: c:J <br /> <br />Unit Cost: c:J <br /> <br />18 <br /> <br />Cost Estimate: 114,7501 <br /> <br />CostEstimaoo:c:J <br /> <br />CostEstimaoo:c:J <br /> <br />CostEstimaoo:c:J <br />