b. Hazard mitigation awareness grant
Laserfiche
>
Public
>
County Commission
>
2007
>
05-07-2007
>
Consent agenda
>
b. Hazard mitigation awareness grant
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2007 9:08:28 AM
Creation date
5/1/2007 9:06:31 AM
Metadata
Fields
Template:
Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />INSTRUCTIONS: <br /> <br />a. Press F1 for help for each field. <br />b. Navigate through the form by using the TAB key or the mouse to highlight and enter data in each field. <br />c. All Questions in RED are required. <br />d. Documents attached must be in version WORD 97 or above or WORDPERFECT 6.0 or above. <br /> <br />(R8-PA-5/1/2004) <br /> <br />-------------------------------------------------------------------------------------------- <br />-------------------------------------------------------------------------------------------- <br /> <br />>THIS PROJECT REDUCES HAZARD EFFECTS AND RISKS BY 1) A DIRECT EDUCATIONAL CAMPAIGN <br />DIRECTED AT YOUTH IN GRADES 3-6; 2) A STATEWIDE DISTRIBUTION OF EDUCATIONAL, <br />INFORMATIONAL AND INSTRUCTIONAL MATERIAL IN A ITEM THAT CAN BE UTILIZED ALL YEAR LONG <br />IN NORTH DAKOTA HOMES; AND, 3) CREATION OF PRIVATE SECTOR PARTNERSHIPS THAT SHARE <br />THE RESPONSIBILITY, COST AND SUPPORT OF THE MESSAGE. <br /> <br />D. DESCRIBE ANY OTHER PROJECTS OR PROJECT COMPONENTS, WHETHER OR NOT FUNDED BY <br />FEMA, WHICH MAY BE RELATED TO THE PROPOSED PROJECT, OR ARE IN OR NEAR THE PROPOSED <br />PROJECT AREA. FEMA MUST LOOK AT ALL INTERRELATED PROJECTS UNDER NEPA REGULATIONS. <br />(Failure to disclose could jeopardize Federal funding.)DOES THE PROPOSED PROJECT MERELY IDENTIFY <br />OR ANALYZE THE HAZARDS OR THE PROBLEM(S)? (either describe in 2,000 characters or less or attach <br />separate word document) <br /> <br />(Either describe in 4,000 characters or less or attach/ enclose separate WORD document) <br /> <br />>THERE ARE NO RELATED PROJECTS. THE PROPOSED PROJECT DOES NOT MERELY IDENTIFY OR <br />ANALYZE THE HAZARDS OR PROBLEMS. <br /> <br />E. WHEN WILL THE TOTAL PROJECT (INCLUDE ALL PHASES/PARTS) BE COMPLETED? (Indicate from <br />Approval Date plus number of day, weeks, months etc.) <br />(Describe either describe in 4,000 characters or less or attach/enclose separate WORD document) <br /> <br />>PROJECT COMPLETION IS SCHEDULED TO VIA CALENDAR DISTRIBUTION ON OR NEAR DECEMBER <br />8, 2007. <br /> <br />F.DESCRIBE THE PROBLEM YOU ARE ATTEMPTING TO SOLVE AND THE EXPECTED OUTCOME. <br /> <br />F. <br /> <br />(Describe either describe in 4,000 characters or less or attach/enclose separate WORD document) <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.