Laserfiche WebLink
<br />h:bruary 14.2007 <br /> <br /> <br />I.o:>s Architecture & Interiors <br />Attention: Tom Dewald <br />810 First Avenue North <br />Fargo. NO 58]02 <br /> <br />RL: Cass County Jail Addition <br />Fargo. NOl1h Dakota <br /> <br />4511 15th Avenue '\iort!> <br />FARGO, I'JD 5810::: <br />Phone (701) ;:21'/':327 c1 <br />Fax (701) 2773::56 <br />www.comstocKc(ms1 corn <br /> <br />Contractor Proposal #17 <br /> <br />PR 24G: <br /> <br />Part I - Add Continuous Handrail at stairs GS-I and HS-I <br />Part 2 - Demolition Work in H-219 for Toilet Paper Holder <br />..pal t 3 Pr8G~llt PlaRll Mudili\:aliulI alii-1M rUt Blud( <br />Part 4 - Install Closun' Angle Iron at Precast Termination <br />Part 5 - Masonry Partitions in lieu of Specified Studs and I>r~wall <br /> <br />Base Bid: <br /> <br />$ 6,615 <br /> <br />Part I: $ <br />Part 2: $ <br />Pti.13. S <br />Part 4: S <br />Part 5: S <br /> <br />3,224 <br />317 <br />15..... <br />848 <br />1,975 <br /> <br />Included: <br /> <br />Part I: Labor and material to add continuous handrail at Stairs GS-I and l-JS-I. <br />Part 2: Labor and material to sawcut and demo a portion of the precast plank to receive toilet paper <br />carrier in Cell H-219. <br />Pelt 3: Lfl/3er and ffiatelifll to ~a"'€:l:lt langittltliflflll) pre:efl:'lt plank I1tll-204 1\:1,;\:;" '-<penes lJloek. <br />Part 4: Labor and fastener material required to attach 3" x Y angle iron at roof plank\\all <br />intersection at the North end o1'D<I)room in Area G and South end llfDayrool11 in Area H. <br />Part 5: Additional labor and material costs associated with installation and removal of masonr) <br />partitions in Corridors G-100 and G-200 in lieu of specified panit iOlh. <br /> <br />b.cluded: <br /> <br />I. Mechanical <br />., Electrical <br />3. Testing <br />4. Structural Design <br />5. Anything not included ahove <br /> <br />Quali fications: <br /> <br />I. This proposal is subject to price n:visions if not accepted \\ ithin 20 days of the date listed <br />above. <br />., With the acceptance of this proposal a O-day time extension is rCljum.:d. <br /> <br />Breakdown: Individual breakdowns attached <br /> <br />~I. ., lllt.'_i!,>'_'- <br />