Laserfiche WebLink
<br />February 14, 2007 <br /> <br /> <br />Foss Architecture & Interiors <br />Attention: Tom Dewald <br />810 First Avenue North <br />htrgo. ND 58102 <br /> <br />RI': Cass County Jail Addition <br />Fargo. North Dakota <br /> <br />4511 15th AvemJ8 North <br />FARGO, NO 5BlO;~ <br />Phone (701) <~Tl,32!4 <br />Fax (701) 277-3256 <br />www,comstockcunst.co!T1 <br /> <br />Contractor Proposal #17 <br /> <br />PR 24G: <br /> <br />Part I - Add Continuous Handrail at stairs CS-I and HS-I <br />Part 2 - Demolition Work in H-219 for Toilet Papcr Holder <br />Part 3 - Precast Plank Modification at H-204 for Block <br />Part 4 - Install Closure Anglc Iron at Precast Termination <br />Part 5 - Masonry Partitions in lieu of Specified Studs and Drywall <br /> <br />Uase Bid: <br /> <br />$ 6,615 <br /> <br />Part I: S <br />Part 2: $ <br />Part 3: S <br />Part 4: $ <br />Part 5: $ <br /> <br />3.224 <br />317 <br />251 <br />848 <br />1,975 <br /> <br />Included: <br /> <br />Part I: Labor and material to add continuous handrail at Stairs GS-I and lIS-I. <br />Part 2: :"abor and material to sawnn and demo a portion of the precast plank to receive toilet paper <br />carrier in Cell H-219. <br />Part 3: Labor and material to Sa\VClIt longitudinally precast plank at H-204 receive exposed block. <br />Part 4: Labor and fastener material required to attach r x r angle iron at roof plank/wall <br />intersection at the North end of Dayroom in Area U and South end uf Dayroom in Area H. <br />Part 5: Additional labor and makrial costs associated with installation and removal of masonry <br />partitions in Corridors U-I 00 and (i-200 in lieu of specified partition". <br /> <br />Excluded: <br /> <br />I. Mechanical <br />") Electrical <br />3. Testing <br />4. Stl uctural Design <br />5. Anything not included abo\(' <br /> <br />Qualilications: <br /> <br />I. <br /> <br />This proposal is subject to price revisions if not accepted within 20 days of the date listed <br />al)o\e. <br />With the acceptance of this proposal a O-day time extension is required, <br /> <br />") <br /> <br />Breakdown: Individual breakdowns attached <br />