Laserfiche WebLink
<br />11.3.4 Trip Generation <br /> <br />The developments ADT shall by calculated by trip generation rates prepared by the ITE <br />as indicated in (Table 11.2) or as listed in the latest edition of the ITE Generation Manual. <br />Trip generation rates from other sources may be used if the applicant demonstrates that <br />these sources better reflect local conditions. <br /> <br />11.3.5 Improvement Costs <br /> <br />If a turn lane is warranted the cost of such improvement shall be the responsibility of the <br />applicant and constructed to the design and specifications of the County Engineer. <br /> <br />24 <br /> <br />:' 1 <br />