Laserfiche WebLink
<br />North Dakota National Pollutant Discharge Elimination System General Permit NDR04-0000 <br />Cass County - Phase II MS4 SWPPP Best Management Practices <br />2006 P~rmit Year Annual Report <br /> <br />6.III.E HAZARDOUS MATERIALS STORAGE PROGRAM COMPLETE DEVELOPMENT OF The education material developed and The use of employee handouts will <br /> PROCEDURES AND CRITERIA implemented June 10, 2005 are continuing to standardize and continue this <br /> be employed for employee education, Annual education. <br /> meeting held on October 18, 2006 to review <br /> storm water procedures. <br />6.III.F SPILL RESPONSE AND PREVENTION PROGRAM COMPLETE DEVELOPMENT OF The education material developed and The use of employee handouts will <br /> PROCEDURES AND CRITERIA implemented June 10, 2005 are continuing to standardize and continue this <br /> be employed for employee education. Annual education. <br /> meeting held on October 18, 2006 to review <br /> storm water procedures. <br />6.III.G USED OIL RECYCLING PROGRAM COMPLETE DEVELOPMENT OF USED The education material developed and The use of employee handouts will <br /> OIL RECYCLING PROGRAM implemented June 10, 2005 are continuing to standardize and continue this <br /> be employed for employee education. Annual education. <br /> meeting held on October 18, 2006 to review <br /> storm water procedures. <br />6.III.H ROAD SAND APPLICATION AND STORAGE DEVELOP AND IMPLEMENT All of the necessary sand/salt mix is stored Cass County developed procedures <br /> PROCEDURES ADJUSTMENTS TO APPLICATION RATE inside. All Cass County Highway Department to ensure the proper enclosure or <br /> (This was a specific permit-identified requirement) ACCORDING TO YEAR 1 AND 2, employees are regularly trained in the proper covering and application of salt- <br /> IMPLEMENT A STAFF TRAINING application techniques of road sand/salt. treated sand, in coordination with <br /> PROGRAM. Approximately # tons of sand/salt mix was the city of Fargo. The program will <br /> used during 2006. Any residual remained continue to include regulating the <br /> inside and was not exposed to any runoff. amount of applied road sand to <br /> reflect site-specific characteristics. <br />6.11I.1 EDUCATIONAL OUTREACH PROGRAM CONTINUE TO DEVELOP EDUCATIONAL Implemented educational handouts. Annual Cass County will continue to <br /> (This was a specific permit-identified requirement) TRAINING PROGRAM FOR OPERATIONS meeting held on October 18, 2006 to review educate the public on developing, <br /> STAFF storm water procedures implementing, and enforcing a <br /> program that will reduce or eliminate <br /> the impacts of storm water runoff <br /> from facilities and maintenance <br /> operations that discharge into the <br /> storm water conveyance system <br /> during the permit term, <br />6.111.J SNOW REMOVAL OPERATIONS COMPLETE DEVELOPMENT OF THE Evaluated new snow disposal site location Cass County developed procedures <br /> (This was a Primacy-noted deficiency) NEW SNOW DISPOSAL SITE LOCATION policy and inspected 100% of the current snow to ensure the proper location and <br /> POLICY; INSPECT 20% OF DISPOSAL disposal areas. Snow disposal for Highway maintenance of county snow <br /> AREAS Department is located on flat vegetated slope disposal sites in coordination with <br /> allowing for infiltration of snowmelt and the city of Fargo. The program will <br /> vegetation acts as natural filter strip. continue to include regular <br /> inspections and maintenance to <br /> ensure that sediments and debris <br /> do not remain in any storm <br /> conveyance system. <br />i ,___----L- I <br />- <br /> <br />AttaChments: Employee handouts, sign-in sheet, and memo regarding mandatory meeting. Map of the Highway Department grounds, <br /> <br />~Do"um(en1S and S"\:"'J"\ ""ie," l Sea "..,,'Tempoc8I', r.o," OL-be s,,\,ppp.P,an.200~ass County Phase II SWPPP 2006 Final <br /> <br />Page 10 <br />