6. Jail addn change orders
Laserfiche
>
Public
>
County Commission
>
2006
>
12-18-2006
>
Regular agenda
>
6. Jail addn change orders
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2006 2:10:29 PM
Creation date
12/12/2006 2:00:01 PM
Metadata
Fields
Template:
Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />(ktober 26. 2006 <br /> <br /> <br />Foss Architecture & Interiors <br />Attention: Thomas Dewald <br />8]0 First Avenue North <br />Fargo, NO 58101 <br /> <br />RL <br /> <br />Cass County Jail Addition <br />Fargo. North Dakota <br /> <br />4511 15th Avenue North <br />FARGO, NO 58,0:2 <br />Phone (701) 277.3274 <br />Fax (701) 277 .32~)6 <br />www.comstockconsl.com <br /> <br />" 1'1.; <br />Proposal Request#9 ' /.j ~ <br />PR 13(; - Install Lintel at Ductwork Opening <br /> <br />Base Bid: <br /> <br />$1 ,461 <br /> <br />Included: <br />I. <br /> <br />Labor and material to install lintel composed of two 8' x 8"" '>" angle irons and a ]5" x',," <br />plate into sawcut opening as located in PR ] 3G. <br /> <br />I:xcluded: <br />I. <br />') <br /> <br />3. <br /> <br />Mechanical <br />Electrical <br />Testing <br />Structural Design <br />Additional Masonry Work Required to In-fill Opening. <br />Anything not listed abo\"l' <br /> <br />4. <br />5. <br />6. <br /> <br />Qualifications: <br />I. This proposal is subject to pricc rcvisions if not accL'pkd \\ ithin 20 days of the date listed <br />above. <br />2. With the acceptance of this proposal a O-day time extension is required. <br /> <br />Breakdown: <br /> <br />Fargo Tank & Stt'el <br />18% 011 & P <br /> <br />S 246.00 <br />S 42.00 <br />S 45,00 <br />S 905.24 <br />, ....____...L-_222~88 <br />Total $ 1,46I.l2 <br /> <br />6 hrs. <br />Equipment <br />Materia] <br /> <br />Comstock Construction I nl'. <br /> <br />Respectfully Submitted <br /> <br />~~ <br /> <br />liabe Oliver <br />Project Manager <br />Comstock Construction. Inc. <br /> <br />C: Ii Ie <br />
The URL can be used to link to this page
Your browser does not support the video tag.