Laserfiche WebLink
<br />PROPOSAL REQUEST <br /> <br /> <br />.II C <br /> <br />Project: Cass County Jail Addition PR No.: 13G <br /> Fargo, North Dakota <br /> Date: September 26,2006 <br />Owner: Cass County <br /> Project No.: 0509 <br />To: Comstock Construction, Inc. <br /> P. O. Box 1145 Contract For: General Construction <br /> Wahpeton, ND 58074 <br /> Contract Date: September 15, 2005 <br /> <br />Please submit an itemized quotation for changes in the Contract sum and/or time incidental to <br />proposed modifications to the Contract Documents described herein. <br /> <br />THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH WORK DESCRIBED <br />HEREIN. <br />DESCRIPTION: <br /> <br />Provide all materials and labor required to saw cut the existing wall, demo existing wall as required <br />to install steel lintel. Relocate existing conduits and relate conductors and pneumatic lines as <br />required for the installation of ductwork above door H-211 in Storage Room H-211. Reference <br />attached details for further information. <br /> <br />Proposed modifications will (~) (decrease) <br /> <br />Contract sum by $ #1 =:: .I' 3/ S <6 ? <br />#9 -=- i' ~ ~61 <br />ATTACH ITEMIZED COST BREAKDOWN <br />TO SUPPORT ABOVE STATED AMOUNT <br /> <br />Comstock Construction, Inc. <br />Contractor <br />6ak oA~ <br />~,~J ~~<~ <br />(;1 ./ <br /> <br />By <br /> <br />Title <br /> <br />Date /0- )....7- ~6 <br /> <br />INITIATED BY: Foss Architecture <br /> <br />PROJECT MANAGER: Rick HOQanson <br /> <br />DATE: <br /> <br />Sept 26, 2006 <br /> <br />DATE: <br /> <br />WRITTEN BY: Thomas Dewald CPC OWNER'S APPROVAL: <br /> <br />www.fossarch.com <br /> <br />810 1st Avenue North <br />Fargo, North Dakota 58102 <br /> <br />Phone: 701.282.5505 <br />Fax: 701.232.5338 <br /> <br />info@fossarch.com <br /> <br />_"c <br />