Laserfiche WebLink
<br />CASS COUNTY I-IIGHWA Y DEPARTME:\ r <br />CONTRACT <br /> <br />I'his a~~reement made and entered into b: Cass County. North f )al-.\.ta. party of the first part. ,lIld <br />Swinl!en Constn;ction Compam. 1437 83'.1 Street N.. PO Box 13456 Grand Forb. Nt) 58208-3456 party of the second part <br />(hereinafter called Contractor), WITNESSETH: <br /> <br />I. That for and in consideration of the payments to be made by the party ofthe first part the contractor promises and agrees to <br />furnish and deliver all labor. equipment, and materials, and to payor cause to be paid as thc) become due, all claims for any work. labor, <br />materials, equipment, including equipment rental or repair. and other supplies or insurance prcmiums. all of which are attributable to or <br />uti I ized in and about the improvement and construction of Project No. TB0602. In accordance and in confonnity with the provisions of <br />this contract and bond, the project proposal. the standard specification, supplemental specifications. special provisions, and the limits of <br />the project as outlined in the proposal dated September 6. 2006, the originals of which are on file at the Cass County Highway <br />Department, and all of which are hereby made a part of this agreement as fully and 10 the same dTect as if the same had been set forth in <br />the body of this agreement. References in the Standard Specifications for Road and Brid~e Construction, 2002 edition, to the North <br />Dakota Department of Transportation or Department must be construed as referring to the owner. Likewise, a reference by the same <br />works to engineer or director must be construed as referring to the owner of the project. <br /> <br />2. The party of the first part agrees and promises to pay to the Contractor for said work. when completed and accepted in <br />accordance with the provisions of this contract. the price set forth in the said proposal. amounting approximately to <br />Twentv-two Thousand Eight Hundred and 0011 00 ($22,800.00), payments to be made as provided in said specifications upon <br />presentation of the proper certificates of the County Engineer, or his representatives. undunder the terms of this contract. <br /> <br />3. The said work shall be done in accordance with the terms of this contral:t. and the laws of the State of North Dakota. under <br />direct supervision and to the entire satisfaction of the County Highway Department. subject at all times to the inspection and approval of <br />the engineer. <br /> <br />4. The decision of the engineer upon questions connected with the execution of this agreement or any failure or delay in the <br />prosecution of the work by the Contractor shall be final and conclusive. <br /> <br />5. In the employment oflabor, other things being equal, preference shall be giwn to honorably discharged Veterans of the <br />Armed Forces, and bona fide North Dakota residents. as determined by NDCl' Section 43-07-20. <br /> <br />6. The Contractor shall begin construction work when so ordered by the Cass Count: Highway Department and shall maintain <br />at all times therl.:on a maximum and efficient working force necessary to complete the work \\ ithin the time established by this contract. <br />( lt~ <br /> <br /> <br />ITNESS THEREOF, the parties to this contract have set their hands and scal this <br />7006. <br /> <br />day <br /> <br />CASS COUNTY NORTl f DAKOTA <br /> <br />Chairman, Cass County Board of Commissioners <br /> <br />Contractor <br /> <br />WITNESS 'ro CONTRACTOR'S SIGNATURE <br /> <br />By <br /> <br />Title <br /> <br />J \AJ)f\ll\!~I~,:\'(j"'ROJH r.'. HI_I" WISFR BR(, REP,\IR\CONTRAl'T SWI;..;Gf<'\i (ON~ 1 (!Cll 1i'h DOC <br />