06-25-2020
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Minutes
>
2020
>
06-25-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2020 2:42:56 PM
Creation date
7/21/2020 2:42:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Dr. Mahoney and Executive Director Paulsen had a virtual meeting with Governor Burgum on June 24th. The purpose of the meeting was to update the <br />Governor on the current construction activity on the Diversion, the contested <br />case hearing and the budget process. <br /> <br />The P3 RFP Draft #5 will be sent out on June 29th. <br />7. USACE PROJECT UPDATE <br />Ms. Williams provided the following Project updates: <br /> 1. Diversion Inlet Structure Construction Structure includes 3-50 ft. wide Tainter gates. The current construction <br />completion date is 7 June 2023. Anticipated remaining schedule: <br />2020: Foundations/site work, control structure, dam walls. <br />2021: Concrete piers/abutments, control building. <br />2022: Install bridge deck, gates, and operating machinery. 2023: Paint gates, seed. <br />2024: Turf established. <br /> <br />2. Wild Rice River Structure Construction <br />Structure includes 2-40 ft. wide Tainter gates. Construction began in May 2020. Excavation and west dam embankment construction continues. The required <br />construction completion is October 2023 <br /> <br />3. Red River Structure Design <br />Structure includes 2-50 ft. wide Tainter gates. Physical model (1:40 scale) is back up and running and is being used to test a number of design alternatives. <br />The design remains on schedule. The 35% plans and specs review by the DA is <br />complete and the 65% review is scheduled to begin in October 2020. Final plans <br />and specs are scheduled to be completed in September 2021. <br /> 4. Southern Embankment – Reach SE-1 (Western Tieback) <br />The 95% design for the Western Tieback will be provided for DA and agency <br />technical review on 6 July 2020. Final plans and specs are scheduled to be <br />available September 2020. Construction contract award could be delayed until <br />2nd quarter FY21 due to delays in land acquisition. <br />5. Southern Embankment – Reach SE-2A <br />Detailed design is commencing and we anticipate having final plans and <br />specifications by November 2021. Rock Island District is assisting with design for <br />Reaches SE-2A, SE-2B and SE-4. <br />
The URL can be used to link to this page
Your browser does not support the video tag.