Laserfiche WebLink
<br />HMG_TO16-A13_Long.docxHMG_TO16-A12_Long 3 <br /> Revise draft floodplain ordinances based on input and comments from <br />local jurisdictions, and conduct four outreach meetings with local <br />jurisdictions. <br />B.1.d. Additional Permits <br />B.1.d.1 In general, the major requirements for agency review to acquire permits are a <br />permit submittal along with design drawings. <br />B.1.d.2 Prepare the permit submittals under this Task Order. <br />B.1.d.3 The development of Final Design drawings and floodway mapping that are <br />required to be submitted with the permit submittal will occur under other Task <br />Orders. <br />Deliverables: <br /> 404 Permit Submittal <br /> 401 Water Quality Certification Submittal <br /> Floodplain Permit submittals <br /> FEMA 2nd Street North CLOMR submittal <br /> FEMA Overall FM Diversion CLOMR submittal <br /> MN DNR Dam Safety submittal <br /> ND SWC Dam Construction submittal <br /> Draft and Final Post Project Floodplain Ordinances <br /> FEMA Mickelson Field and Levee projects LOMR submittal <br /> Wild Rice Dam removal submittal <br /> Drayton Dam Removal submittal <br /> SEAI Permit package <br /> <br />B.2. Permit Acquisition Support Services: Provide the following general permit acquisition support <br />services as requested by Owner. <br />B.2.a. Engage in meetings, other communication, and coordination with regulatory agencies as <br />needed to provide information or clarification required to facilitate a timely processing <br />of permit submittal. <br />B.2.b. Provide responses to regulatory agency comments or questions regarding submittal. <br />B.3. Minnesota DNR Permits, Governors’ Task Force: A Governor’s task force has been <br />established to develop design principles and concept-level engineering solutions to <br />achieve balanced flood risk management for the Fargo-Moorhead region, including up- <br />and downstream communities and properties. Provide the following services to support <br />the task force: <br />B.3.a. Alternative Evaluations: Provide H&H unsteady flow modeling of proposed alternatives <br />to the Project. Alternatives include but are not limited to: Southern Embankment, Flows <br />Through Town, Ring Levees. <br />B.3.b. Deliverables include: mapping, calculation of floodplain acreages, calculation of <br />impacted structures, upstream and downstream impacts, and cost estimates. <br />B.3.c. Preparation for and attend Task Force and Technical Advisory Group meetings as <br />requested by the Diversion Authority. <br /> <br />C. Subtask C - On-Call Services DRAFT