Laserfiche WebLink
<br />1 -.....,.... <br /> <br />------- -.~._-----~----_..._------~--_._---_. -- <br /> <br />.,.7' <br /> <br />ALTERNATIVES <br />GDU Import to Sheyenne River <br /> <br />This alternative would supplement existing water supplies to meet future water needs with a <br />combination of Red River, other North Dakota in-basin sources, and water imported from the <br />Missouri River. The alternative would include a biota treatment plant at the McClusky Canal. <br />The biota treatment process would use coagulation, flocculation, sedimentation, and <br />ultraviolet disinfection. The principal feature of this alternativ'e would be a buried pipeline <br />from the McClusky Canal that would release treated Missouri River water into the Sheyenne <br />River just above Lake Ashtabula. The pipe would be sized to allow peak-day demands to be <br />met by releases from Baldhill barn into tlie Sheyenne River. A buried pipeline would serve <br />industrial water demands in southeastern North Dakota. The estimated construction cost of <br />this alternative is between $500 million to $660 million. <br /> <br />\. <br />'; <br />" <br />'~f{" <br /> <br />, '..",Ci! <br />l.4;&h1 <br /> <br />'. <br /> <br />Pembina <br /> <br /> <br />'- <br /> <br />LDIJ[do/l <br /> <br />, <br /> <br />.:,. <br /> <br />; <br />DmytOl}I <br />. - . ~ <br />Glafroi.. - . i <br />, <br />, <br />I <br />t <br />. \ Grand Forks! <br />\ EGland FCJrkt,' <br /> <br /> <br />..~_. <br />.$:;:;." .~, <br />~t~~. :0'\. <br />\~i$). ,. <br />).~~ <br />,~\ <br />~_i_ ->-'~>7 <br />:_~ <br />" <br /> <br /> <br />..---- Pipeline <br />~ River Conveyance <br />o Biola Trealmenl Plant <br />'* Demand Point <br /> <br />y <br />'--\ <br /> <br />o Hudson Bay Drainage <br />~ Missouri River Drainage <br />Service Area within Hudson Bay Drainage <br />~ Reservalion lands <br /> <br />.' <br /> <br />.- <br /> <br />- <br /> <br />