2. Kindred truck route contract
Laserfiche
>
Public
>
County Commission
>
2006
>
04-17-2006
>
Regular Agenda
>
2. Kindred truck route contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2006 4:40:34 PM
Creation date
6/6/2006 4:40:12 PM
Metadata
Fields
Template:
Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ARTICLE 4 . CONTRACT TIMES <br /> <br />4.0 I Time of the Essence <br /> <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in <br />the Contract Documents are of the essence of the Contract. <br /> <br />4.02 Dates for Substantial Completion and Final Payment <br /> <br />A. The Work will be substantially completed on or before Aueust 1. 2006, and completed and ready for final payment in <br />accordance with Paragraph 14.07 of the General Conditions on or before August 1. 2006. <br /> <br />4.03 Liquidated Damages <br /> <br />A. Contractor and Ownerrecognize that time is ofthe essence ofthis Agreement and that Ov-ner will suffer financial loss ifthc <br />Work is not completed within the times specified in Paragraph 4.02 above, plus any extensions thereof allowed in accordance with <br />Article 12 of the General Conditions. The parties also recognize the delays, expense, and difficulties involved in proving in a legal <br />or arbitration proceeding the actual loss suffered by Ov-ner if the Work is not completed on time. Accordingly, instead of <br />requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty), Contractor shall <br />pay Ov-ner amounts as soecified in the Soecial Provisions for each day that expires after the time specified in Paragraph 4.02 for <br />Substantial Completion until the Work is substantially complete. After Substantial Completion, if Contractor shall neglect, refuse, <br />or fail to complete the remaining Work within the Contract Time or any proper extension thereof granted by Ov-ner, Contractor <br />shall pay Ov-ner amounts as soecified in the Special Provisions for each day that expires after the time specified in Paragraph 4.02 <br />for completion and readiness for ftnal payment until the Work is completed and ready for ftnal payment. <br /> <br />ARTICLE 5 . CONTRACT PRICE <br /> <br />5.01 Ov-ner shall pay Contractor for completion of the Work in accordance with the Contract Documents an amount in current <br />funds equal to the sum of the amounts determined pursuant to Paragraphs 5.01.A below: <br /> <br />A. For all Work, at the prices stated in Contractor's Bid, attached hereto as an exhibit. <br /> <br />ARTICLE 6 . PAYMENT PROCEDURES <br /> <br />6.01 Submittal and Processing of Payments <br /> <br />A. Contractor shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications <br />for Payment will be processed by Engineer as provided in the General Conditions. <br /> <br />6.02 Progress Payments; Retainage <br /> <br />A. Ov-ner shall make progress payments on account of the Contract Price on the basis of Contractor's Applications for <br />Payment on or about the 15th day of each month during performance of the Work as provided in Paragraphs 6.02.A.1 and 6.02.A.2 <br />below. All such payments will be measured by the schedule of values established as provided in Paragraph 2.07.A of the General <br />Conditions (and in the case ofUoit Price Work based on the number of units completed) or, in the event there is no schedule of <br />values, as provided in the General Requirements: <br /> <br />I. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below <br />but, in each case, less the aggregate of payments previously made and less such amounts as Engineer may determine or Ov-ner <br />may withhold, including but not limited to liquidated damages, in accordance with Paragraph 14.02 of the General Conditions: <br /> <br />a. 90 percent of Work completed (with the balance being retainage). If the Work has been 50 percent completed as <br />determined by Engineer, and if the character and progress of the Work have been satisfactory to Ov-ner and Engineer, <br />Ov-ner, on recommendation of Engineer, may detennine that as long as the character and progress of the Work remain <br />satisfactory to them, there will be no additional retainage: and <br /> <br />EJCDC C-S20 Suggested Form of Agreement Between Owner and Contractor for Construction Contract (Stipulated Price) <br />Copyright 8 1002 Natboal Society of ProCessional Engineen for EJCDC. All rights reserved. <br />00510-1 <br />