Laserfiche WebLink
<br />MEMORANDUM OF AGREEMENT <br />SUBMITTED TO THE ADVISORY COUNCIL ON HISTORIC PRESERVATION <br />PURSUANT TO 36CFR800.6(a) <br /> <br />Cass County Project Number BRO-0009(030) <br />NDDOT Bridge Number 09-113-39.1 <br /> <br />WHEREAS, the North Dakota Division Office of the Federal Highway Administration <br />(FHW A) has detennined that Project Number BRO-0009(030) will have an effect upon a bridge <br />6 miles east and 6 miles south of Alice, North Dakota, over the Maple River, a property eligible <br />for inclusion in the National register of Historic Places, and has consulted with the North Dakota <br />State Historic Preservation Officer (SHPO) pursuant to 36CFR Part 800, regulations <br />implementing Section 106 of the National Historic Preservation Act (16 U,S.C. 470); and <br /> <br />WHEREAS, the North Dakota Department of Transportation and Cass County <br />participated in the consultation and have been invited to concur in this Memorandum of <br />Agreement; and <br /> <br />NOW, THEREFORE, FHW A, and the North Dakota SHPO agree that the undertaking <br />shall be implemented in accordance with the following stipulations in order to take into account <br />the effect of the undertaking on historical properties. <br /> <br />Stipulations <br /> <br />The FHW A will insure that the following measures are carried out: <br /> <br />I. The structure shall be recorded in accordance with Section 110 (b) of the National <br />Historic Preservation Act. This shall include Stipulations: <br /> <br />A. Write a short narrative summarizing the information present in the State <br />Site (SITS) Form and NODOT files. This narrative shall include a brief <br />history of the bridge, any unusual design or construction elements of the <br />bridge, and a basic description of the location, setting, measurements, <br />construction, and design of the bridge. <br /> <br />B. Black and white photographs of the construction details of the bridge shall <br />be taken. Color overview pictures of the bridge including profile views, <br />roadway views, superstructure views, railing views, and substructure <br />views shall be taken. <br /> <br />C. A short report presenting the narrative (Stipulation A) and photographs <br />(Stipulation B) shall be developed and produced, Five (5) copies of this <br />report shall be submitted to NDDOT. The report shall be submitted in <br />electronic form in addition to paper copies. Electronic form shall consist <br />of pdjformat and Microsoft Word doc format. Pictures shall be included <br />as high quality tif or jpg files. Electronic versions shall be submitted on <br />optical disc (CD or DVD). <br />