c. Contract approval
Laserfiche
>
Public/Website
>
County Commission
>
2006
>
01-03-2006
>
Consent Agenda
>
c. Contract approval
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2006 10:25:00 AM
Creation date
6/5/2006 10:23:50 AM
Metadata
Fields
Template:
Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />able to sureties as a defense in the jurisdiction of the suit <br />shall be applicable. <br /> <br />10 Notice to the Surety. the Owner or the Contractor shall <br />be maiied or delivered to the address shown on the <br />signature page, <br /> <br />11 When this Bond has been fumished to comply with a <br />statutory or other legal requirement in the location where <br />the construction was to be performed, any provision in <br />this . Bond conflicting with said statutory or legal <br />requirement shall be deemed deleted herefrom end <br />provisions confonning to such statutory or other legal <br />requirement shall be deemed incorporated herein. The <br />intent is that this Bond shall be construed as a statutory <br />bond and not as a common law bond. <br /> <br />12 DEFINITIONS <br /> <br />12.1 Balance of the Contract Price; The total amount <br />payable by the Owner to the Contractor under the <br />Construction Contract after all proper adjustments <br /> <br />MODIFICATIONS TO THIS BOND ARE AS FOLLOWS: <br /> <br />have been made including allowance to the <br />Contractor of any amounts received or to be <br />received by the Owner in settlement of insurance or <br />other claims for damages to which the Contractor is <br />entitled, reduced by all valid and proper payments <br />made to or on be- half of the Contractor under the <br />Construction Contract. <br /> <br />12.2 Construction Contract: The agreement between <br />the Owner and the Contractor identified on the sig- <br />nature page, induding all Contract Documents and <br />changes thereto. <br /> <br />12.3 Contractor Default: Failure of the Contractor, <br />which has neither been remedied nor waived, to <br />perfonn or otherwise to comply with the tenns of the <br />Construction Contract. <br /> <br />12.4 Owner Default: Failure of the Owner, which has <br />neither been remedied nor waived. to pay the Con- <br />tractor as required by the Construction Contract or to <br />perfonn and complete or comply with the other terms <br />thereof. <br /> <br />(Space is pro\llded below for additional signatures of added parties, other than those appearing on the cover page.) <br /> <br />CONTRACTOR AS PRINCIPAL <br />Company; <br /> <br />(Corporate Seal) <br /> <br />Signature: <br />Name and Title: <br />Address: <br /> <br />SURETY <br />Company; <br /> <br />(Corporale Seal) <br /> <br />Signature: <br />Name and Title: <br />Address: <br /> <br />CON 0387 (08/01) <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.