01-30-2020
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2020
>
01-30-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2020 12:23:11 PM
Creation date
1/28/2020 12:23:05 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Activities and Achievements <br />In-Town Works Status <br />•Preparing three projects for bidding (Winter 2020) <br />o WP-43D5 –Hickson Main Avenue Storm Sewer -~$1M <br />o WP-43G –OHB Wetland Mitigation -~$1.4M <br />o WP-50B –Property Structure Mitigation, Phase B -~$300K <br />•Current projects under construction <br />o WP-42E –2nd St. So. and Main Ave. Flood Mitigation –DELAYED <br />Substantial Completion (Plaza and Lift Station #18 lighting) <br />o WP-43CD –OHB Pump Station and Levee –Complete (punch list items) <br />o WP-50A –Property Structure Mitigation, Phase A –Substantially Complete <br />(punch list items)
The URL can be used to link to this page
Your browser does not support the video tag.