k. Contract approval
Laserfiche
>
Public
>
County Commission
>
2005
>
12-19-2005
>
Consent agenda
>
k. Contract approval
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2005 4:10:35 PM
Creation date
12/12/2005 2:47:17 PM
Metadata
Fields
Template:
Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />Houston EnginlJlJPing, Inc. <br /> <br />2505 N. University Dr., Box 5054 . Fargo, NO 58105-5054 . Ph: 701-237-5065 . Fax: 701-237-5101 <br /> <br />December 8, 2005 <br /> <br />Rich Sieg, Cass County Superintendent <br />Cass County Highway Department <br />1201 West Main Avenue <br />West Fargo, ND 58078 <br /> <br />Subject: Design Engineering Services for Project No. CH0603 <br />NDDOT Project No. SC-0957(057) <br />Bituminous Surfacing - Cass County Highway 81 - CR16 to ND46 <br /> <br />Dear Mr. Sieg: <br /> <br />Thank you for giving our firm the opportunity to perform the design engineering for the above <br />listed project. Enclosed, herewith is a listing of the responsibilities, as we understand the project, <br />and a fee proposal. <br /> <br />Houston Engineering responsibilities are as follows: <br /> <br />I. Preliminary Engineering & Project Administration <br /> <br />A. Review scope of work with County. <br />B. Attend PS & E and Preconstruction meetings. <br />C. Prepare typical pavement options and review asphalt mix alternatives. <br />D. Prepare traffic control plan & list traffic control devices, if required. <br />E. Provide input for specifications and bid documents for project. <br />F. Coordinate engineering services. <br /> <br />II. Surveying - As this is an overlay project, we do not anticipate any survey work <br />associated with preparing the plans. <br /> <br />III. Design Engineering & CAD <br /> <br />A. Prepare existing & proposed typical paving sections. <br />B. Calculate topsoil quantity for pavement edging. <br />C. Calculate pavement marking & signing quantities. <br />D. Calculate paving quantities. <br />E. Prepare preliminary and final overlay plans with details. <br />F. Print and plot plans <br /> <br />Minneapolis Office <br />Bismarck Office <br />Thief River Falls Office <br /> <br />. 10900 73rd Ave. N" Suite 106 . Maple Grove, MN 55369-5400 <br />. 3712 Lockport Street . Bismarck, ND 58503 <br />. 208 4th Street East . Thief River Falls, MN 56701 <br /> <br />. Ph: 763-493-4522 <br />. Ph: 701-323-0200 <br />. Ph: 218-681-2951 <br /> <br />. Fax: 763-493-5572 <br />. Fax: 701-323-0300 <br />. Fax: 218-681-2987 <br /> <br />Equal Opportunity Employer <br /> <br />www.houstonengineeringinc.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.