c. Contract approval
Laserfiche
>
Public
>
County Commission
>
2005
>
11-21-2005
>
Consent agenda
>
c. Contract approval
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2005 11:00:42 AM
Creation date
11/14/2005 2:21:50 PM
Metadata
Fields
Template:
Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />the Parties will promptly investigate the conditions and will select replacement sites or adjust the <br />installation plans and specifications as necessary. If change in sites 0 r adjustment tot he installation <br />plans and specifications causes a change in the cost or time to perform, the Parties will equitably amend <br />the Contract Price, Performance Schedule, or both, by a change order. <br /> <br />Section 7 <br /> <br />TRAINING <br /> <br />Any training to be provided by Motorola to Customer will be described in the Statement of Work. <br />Customer will notify Motorola immediately if a date change for a scheduled training program is required. <br />If Motorola incurs additional costs because Customer reschedules a training program less than thirty (30) <br />days before its scheduled start date, Motorola may recover these additional costs. <br /> <br />Section 8 <br /> <br />SYSTEM ACCEPTANCE <br /> <br />8.1. COMMENCEMENT OF ACCEPTANCE TESTING. Motorola will provide to Customer at least ten <br />,(10) days notice before the Acceptance Tests commence. System testing will occur only in accordance <br />with the Acceptance Test Plan. <br /> <br />8.2. SYSTEM ACCEPTANCE. System Acceptance will occur upon successful completion of the <br />Acceptance Tests. Upon System Acceptance, the Parties will memorialize this event by promptly <br />executing a System Acceptance Certificate. If the Acceptance Test Plan includes separate tests for <br />individual Subsystems or phases of the System, acceptance of the individual Subsystem or phase will <br />occur upon the successful completion of the Acceptance Tests for the Subsystem or phase, and the <br />Parties will promptly execute an acceptance certificate for the Subsystem or phase. If Customer believes <br />the System has failed the completed Acceptance Tests, Customer will provide to Motorola a written notice <br />that includes the specific details of the failure. If Customer does not provide to Motorola a failure notice <br />within thirty (30) days after completion of the Acceptance Tests, System Acceptance will be deemed to <br />have occurred as of the completion of the Acceptance Tests. Minor omissions or variances in the System <br />that do not materially impair the operation of the System as a whole will not postpone System Acceptance <br />or Subsystem acceptance, but will be corrected according to a mutually agreed schedule. <br /> <br />8.3. BENEFICIAL USE. Customer acknowledges that Motorola's ability to perform its implementation <br />and testing responsibilities may be impeded if Customer begins using the System before System <br />Acceptance. Therefore, Customer will not commence Beneficial Use before System Acceptance without <br />Motorola's prior written authorization, which will not be unreasonably withheld. Motorola is not <br />responsible for System performance deficiencies that occur during unauthorized Beneficial Use. Upon <br />commencement of Beneficial Use, Customer assumes responsibility for the use and operation of the <br />System. <br /> <br />8.4 FINAL PROJECT ACCEPTANCE. Final Project Acceptance will occur after System Acceptance <br />when all deliverables and other work have been completed. When Final Project Acceptance occurs, the <br />parties will promptly memorialize this final event by so indicating on the System Acceptance Certificate. <br /> <br />Section 9 <br /> <br />REPRESENTATIONS AND WARRANTIES <br /> <br />9.1. SYSTEM FUNCTIONALITY. Motorola represents that the System will perform in accordance <br />with the Specifications in all material respects. Upon System Acceptance or Beneficial Use, whichever <br />occurs first, this System functionality representation is fulfilled. Motorola is not responsible for System <br />performance deficiencies that are caused by ancillary equipment not furnished by Motorola which is <br />attached to or used in connection with the System or for reasons or parties beyond Motorola's control, <br />such as natural causes; the construction of a building that adversely affects the microwave path reliability <br />or radio frequency (RF) coverage; the addition of frequencies at System sites that cause RF interference <br />or intermodulation; or Customer changes to load usage or configuration outside the Specifications. <br /> <br />9.2. EQUIPMENT WARRANTY. During the Warranty Period, Motorola warrants that the Equipment <br />under normal use and service will be free from material defects in materials and workmanship. If System <br /> <br />CSA.FINAL.SeI.1.1.0.05.revision.doc <br />Motorola Contract No. <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.