Amended items
Laserfiche
>
Public
>
County Commission
>
2005
>
10-03-2005
>
Amended items
>
Amended items
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2005 11:37:25 AM
Creation date
10/3/2005 11:36:28 AM
Metadata
Fields
Template:
Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I CASS tbUN'lY1 <br />,GOVERNMENT I <br /> <br />!-'-I <br />1_ . ___J <br /> <br />Highway <br />Department <br /> <br />Keith D. Berndt. P.E. <br />County Engineer <br /> <br />Richard S. Sieg <br />Superintendent <br /> <br />Th(lma~ R. SIIUC}'. r.E. <br />Design and ClIlsrruction <br />Supervis\ lr <br /> <br />1201 Main Avenue \X;est <br />West Fargo. North Dakota <br />5H07S-1301 <br /> <br />701-298-2370 <br />Fax 701- 298- 2395 <br /> <br />RECEIVED <br /> <br />SEP 2 8 2005 <br /> <br />CASS COUNTY COMM!S.~~,'I" <br /> <br />MEMORANDUM <br /> <br />TO: <br /> <br />Cass County Commission <br /> <br />Keith Berndt, Cass County Engineer'''J6 <br /> <br />FROM: <br /> <br />DATE: <br /> <br />September 27, 2005 <br /> <br />~~C IAku <br />C6Yl~efl.t Agenda Topic for October 3,2005 Meeting: <br />Approve changer orders E2 and M 1 for Vector Chemical <br />Storage Building <br /> <br />SUBJECT: <br /> <br />We have generally placed change orders on new building projects in excess <br />of$5,000 on the Commission agenda for approval. There are two change <br />orders in this category required on the chemical storage building. I'm <br />seeking Commission approval on both. The changes are required to meet <br />building code requirements of this type of building. <br /> <br />The original mechanical and electrical designs didn't take into account the <br />building code requirements to meet an H-3 occupancy rating. The <br />omission in the original design came up during the codes review by West <br />Fargo building permit otlicials. ['m satisfied that the architect has <br />researched the matter to reach his conclusion that we don't have any choice <br />but to make the electrical and mechanical design changes. <br /> <br />The changes involve more expensive mechanical and electrical fixtures and <br />added ventilation requirements. The need for the change was discovered <br />before any of the original fixtures were installed so there is no rework <br />involved and presumably the bids would have reHected this cost if it had <br />been included in the original construction contracts. <br /> <br />Between the architect and mechanical/electrical engineering firms, they've <br />agreed to reimburse the County 15% of the change order amount on the <br />assumption that prices on a negotiated change order may not be as <br />competitive as if the work had been included in the original bids. <br /> <br />SUGGESTED MOTION: Approve Changes E-2 and M-I on the Vector <br />Building contract in the amounts of $14,747 and $15,062 respectively. <br /> <br />J \Admm-Eng\Commis"OII Corrsp\2005 Comnllssion Corrcspondencc\COllsent Mcmo Spring Lnad Rest <br />022505 doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.