Laserfiche WebLink
SUMMARY OF COSTS FOR ITEM t: COURT ORDERED SUSPENSION <br /> <br />ESTABLISHED LABOR AND EQUIPMENT RATES: <br /> <br />LABOR: HOURLY RATE <br />Superintendent: $ 44.01 <br />Superintendent: $ 27.08 <br />Operator / Foreman: $ 35.00 <br />Laborers: $ 30.50 <br /> <br />EQUIPMENT: <br /> <br /> DAILY RATE <br /> (10 hrs / day) <br />Pickup (1-10) $ 54.30 <br />Pickup (1-26) $ 48.33 <br />Flatbed (2-5) $ 61.25 <br />Mechanic Truck (2-11) $ 26.20 <br />Honda Generator (4-90) $ 9.05 <br />Case 580 TractodLoader (21-4) $ 88.98 <br />Skytrack Forklift (21-2) $ 66.16 <br />Komatsu WA75 Loader (21-38) $ 66.78 <br />Manbasket (39-054) $ 16.14 <br /> Sub-Total: $ 437.19 <br /> <br />Rental: Dynalift <br />Rental: PC 600 Excavator <br /> <br />$ 225.67 <br />$ 1,261.67 <br /> <br /> Sub-Total: $ <br />TOTAL EQUIP. ON JOB (DALLY RATE): $ <br /> <br />1,487.34 <br />1,924.53 <br /> <br />TRUCKS ON HOLD: <br />Sidedumps: 4.00 EA @ $ 223.11 $ <br />Tandems: 4.00 EA (~ $ 147.53 $ <br /> Sub-Total: $ <br /> <br /> 892.44 <br /> 590.12 <br />1,482.56 <br /> <br /> <br />