Laserfiche WebLink
<br />SHEL TER IN PLACE CHECKLIST <br /> <br />Door Sealin2: Crew <br /> <br />Primary Responsible Employee <br />Alternate Responsible Employee <br /> <br />When a shelter in place advisory is issued, the door sealing crew will: <br /> <br />o Close and lock office window and close door on the way to the shelter-in-place room. <br /> <br />o Remove duct tape from shelter kit. <br /> <br />o Check with receptionist to assure that all employees have entered the shelter-in-place <br />room (approximately 3 minutes after the announcement). Lock door to shelter-in-place <br />room and seal edges with long strips of duct tape. Be sure to tape securely overlaps all <br />edges of the door. Place wet towels at the bottom of the door. <br /> <br />o When the "All Clear" is announced, immediately remove the tape from the door. <br /> <br />o Go outside to the pre-arranged meeting area and check in with a supervisor. <br /> <br />o When the building is thoroughly ventilated and you are instructed to return by the <br />supervisor, return to the shelter-in-place room and return the duct tape rolls to the shelter <br />kit. Also make sure that the battery-operated radio has been returned to the shelter kit. <br /> <br />16 <br />