2a. Road Dept/storm water plan
Laserfiche
>
Public/Website
>
County Commission
>
2003
>
03-03-2003
>
Regular agenda
>
2a. Road Dept/storm water plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2004 2:14:08 PM
Creation date
3/3/2003 4:39:26 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Go <br /> <br />He <br /> <br />Measurable Goals: <br />$ Whether or not an inventory of locations at risk for spills was created. <br />$ Number of preventive maintenance procedures performed on tanks, valves, <br /> pumps, pipes, and other equipment. <br />$ Whether or not a spill response plan was developed for the maintenance <br /> facility. <br />$ Number of personnel trained in spill response. <br />$ Number of regularly inspected high-risk locations. <br />$ Number of educational materials distributed to operations and <br /> maintenance employees. <br /> <br />Responsible Department: <br />Cass County Engineer's Office <br /> <br />Develop a Used Oil-Recycling Program <br />The Cass County Engineer's Office will develop procedures to recycle motor oil <br />and oil filters. <br /> <br />Measurable Goals: <br />$ Number of gallons of used oil collected from county operations. <br />$ Number of educational materials distributed to maintenance staff <br /> employees. <br /> <br />Responsible Department: <br />Cass County Engineer's Office <br /> <br />Develop Road Sand Application and Storage Procedures <br />The Cass County Engineer's Office will develop procedures to ensure the proper <br />storage, enclosure or covering, and application of equipment and materials, <br />including salt-treated sand, in coordination with the city of Fargo. The program <br />will include regulating the amount of applied road sand to reflect site-specific <br />characteristics, such as road width and design, traffic concentration, and <br />proximity to surface waters. <br /> <br />Measurable Goals: <br />$ Number of employees trained in road sand application. <br /> <br />Partner: <br />City of Fargo <br /> <br />Responsible Department: <br />Cass County Engineer's Office <br /> <br />26 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.