2a. Road Dept/storm water plan
Laserfiche
>
Public/Website
>
County Commission
>
2003
>
03-03-2003
>
Regular agenda
>
2a. Road Dept/storm water plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2004 2:14:08 PM
Creation date
3/3/2003 4:39:26 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINIMUM CONTROL MEASURE 4 - CONSTRUCTION SITE STORM WATER <br /> RUNOFF CONTROL <br /> <br />II. <br /> <br />III. <br /> <br />Target Audience <br /> <br />Activities planned under the Construction Site Storm Water Runoff Control portion of the <br />Storm Water Pollution Prevention Program (SWPPP) for Cass County will be directed <br />toward contractors, construction site operators, inspectors, and enforcement personnel. <br /> <br />Goals <br /> <br />The SWPPP activities implemented under Minimum Control Measure (MCM) 4 will <br />focus on partnering with the city of Fargo in the development, implementation, and <br />enforcement of management strategies that will lead to the reduction or elimination of the <br />impacts of storm water runoff from construction activities that result in a land disturbance <br />of greater than or equal to 1 acre into the storm water conveyance system during the <br />permit tenn. <br /> <br />Best Management Practices <br /> <br />Develop Ordinances~ Resolutions~ or Other Regulatory, Mechanisms for <br />Erosion and Sedimentation Controls <br />All of the Cass County storm water conveyances within the urbanized area lie <br />within the extraterritorial zoning authority of the city of Fargo. In accordance with <br />North Dakota Century Code (NDCC) Chapter 40-47, City Zoning, ordinance <br />development and enforcement activities will be under the jurisdiction of the city <br />of Fargo. Construction activities conducted by Cass County within the county <br />right-of-way in the extraterritorial zone of the city of Fargo will be under the <br />direction and control of the county. <br /> <br />Measurable Goals: <br />$ The development and implementation of any regulatory mechanisms required <br /> by this best management practice (BMP) will be conducted by the city of <br /> Fargo. Thus the city will also establish the measurable goal(s) involving these <br /> regulations. <br /> <br />Partner: <br />City of Fargo <br /> <br />Responsible Department: <br />Cass County Engineer's Office <br /> <br />Be <br /> <br />Erosion and Sedimentation Controls for Construction Site Operators <br /> <br />All of the Cass County storm water conveyances within the urbanized area lie <br />within the extraterritorial zoning authority of the city of Fargo. In accordance with <br />NDCC Chapter 40-47, City Zoning, ordinance development and enforcement <br /> <br />14 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.