08-01-2005 Agenda
Laserfiche
>
Public
>
Road Advisory Committee
>
2005
>
08-01-2005 Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2005 3:40:18 PM
Creation date
7/28/2005 2:06:17 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> CASS COUNTY <br /> 28.Jul.05 <br /> 2006 Proposed Construction Projects <br />& Project No.1 Estimated <br />Type of Work Prolect Location Lenath Total Cost Federal Aid Notes <br />Grading & Bnuminous $1.250,000 in 2005 $0 in 2005 Locally funded grading 2005 <br />Surfacing Hwv. 14 - Hwv. 17 to 1-29 4.00 $2,000,000 in 2006 $1,600,000 in 2006 Federal Aid Surfaclna 2006 <br />PCC repairs, shoulder & $1,600,000 in 2005 $1,280,000 in 2005 2005 - Shoulder & culverts 2006- <br />Bnuminous Overlay Hwv. 81 - Hwv. 16 to State Hwy. 46 6.35 $2,400,000 in 2006 $1,920,000 in 2006 Bnuminous overlav <br /> County Parlicipation limned to $20,000 local <br />Asphatt Surfacing Kindred Truck Route TBD $200,000 funds plus $200,000 Federal <br />BRIDGE REPLACEMENT PROGRAM <br /> Estimated Total <br />Project No.lBrldge No. Project Location Cost Federal Aid Bid Date <br /> BID JULY 12, 2005. CONSTRUCTION <br />BRU-8-984(099)102 - FGO- $3,500,000 (+ WORK PLANNED FOR 2005 AND 2006 <br />29 - Share w/MN Red River, County Road 20 $8.000,000 engineering) CONSTRUCTION SEASONS <br /> ~U~\OO ~O 2006 PENDING COMMISSION <br /> APPROVAL, COST SHARE AGREEMENT <br /> WITH WEST FARGO AND FEDERAL AID <br />Structure Replacement - 9- \~) ELIGIBILITY DETERMINATION AND <br />138-28.0 Shevenne River, at 32nd Avenue - West Fareo $1,000,000 $800,000 APPROVAL <br />Structure Replacement - 9- <br />113-39.1 Hwv 7 -Maple River Bridge - 6 East & 6 South of Alice $350,000 $280,000 2006 PENDING FEDERAL FUNDS <br />Structure Replacement - 9- Everest Twp - Between Sections 29 & 30 - 3 West 4 South of <br />120-29.0 Cassetton - Branch of Maple River $350,000 $280,000 2006 PENDING FEDERAL FUNDS <br />Structure Replacement - 9- <br />105-27.0 Hwv 12 -Maple River Bridee - 2 West 6 North of Alice $450,000 $360,000 2006 PENDING FEDERAL FUNDS <br />Structure Replacement - 9- TBD - Less than <br />116-37.0 Maple River Bridee - 9 East and 4 South of Alice $100,000 Local Funds <br />County's request. Structure <br />Replacement - Perley Bridge <br />.142-04.0 - Red River Hwy 26 Bridge - 6 East 2 North Gardner $2,500,000 $1,000,000 2007 PENDING FEDERAL FUNDS <br /> <br />J:\Admin-EngIBUDGET\(2006 Proposed Construction Projects (revised July 05).xls)Shoel1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.