Laserfiche WebLink
February9,2003 <br /> <br />Gcant <br /> <br />MECHANICAL <br /> <br />RECEIVED <br />FEB <br /> <br />CASS C0UN1Y COMMI~II3N <br /> <br />Cass County <br />211 9stS <br />Fargo, ND 58103 <br /> <br />ARm Bonnie Johnson Cass County Coordinator <br /> <br />Re: Contracts Mechanical Demolition Old Cass Co. Jail <br /> <br />Dear Ms. Johnson: <br /> <br />We propose to furnish labor and materials to perform mechanical demolition associated with the jail and <br />residence. All work will be as per plans, specifications and outlines as prepared by T.L.Stroh AIA. <br />All proposal items costs include performance and payment bonds. All work will be performed on a time <br />and material basis with a not to exceed costs as stated below. <br /> <br />BASE BID: <br /> <br />All items as stated on attached tabulation: <br />For the sum not to exceed: $32,015.00 <br /> <br />ADD ALTERNATE # 1: <br /> <br />Mechanical construction associated with new generator installation and per <br />attached ALT 1 ESTIMATE: <br />For the sum not to exceed: $ 2,124.00 <br /> <br />ADD ALTERNATE # 2: <br /> <br />Mechanical Construction associated with relocating existing generator <br />And attached ALT 2 ESTIMATE: <br />For the sum not to exceed: <br /> <br />$26,444.00 <br /> <br />/G~. Jol~on PE President <br /> <br />Cass County Goverment <br /> <br />Attachments <br /> <br />DESIGN · BUILD <br />MECHANICAL CONTRACTORS <br /> <br />3239 15TH STREET SOUTH <br />BOX 7128 <br />FARGO, NORTH DAKOTA 58106-7128 <br />701-232-8891 FAX 701-237-4711 <br />E-mail: grantsmech @worldnet.att.net <br />EQUAL OPPORTUNITY EMPLOYER <br /> <br /> <br />