Laserfiche WebLink
5 <br />Authority, the Work is sufficiently complete, in accordance with the plan approved by the Metro <br />Flood Diversion Authority. “Utility” means WBI Energy Transmission, Inc. “Utility Location Project” means the process of locating and placing Natural Gas <br />Transportation Infrastructure within the Project Site. “USACE” means the United States Army Corps of Engineers. “Work” means those elements of locating and constructing the Natural Gas <br />Transportation Infrastructure that is within the Project Site. Section 1.02 TERMS GENERALLY. The definition of terms herein shall apply equally to the singular and plural forms of the terms defined. Whenever the context may require, any pronoun shall include the corresponding masculine, feminine, and neuter forms. The words <br />“include,” “includes,” and “including” shall be deemed to be followed by the phrase “without limitation.” The word “will” shall be construed to have the same meaning and effect as the word “shall.” Unless the context requires otherwise (a) any definition of or reference to any agreement, instrument, or other document herein shall be construed as referring to such agreement, instrument, or other document as from time to time amended, supplemented, or otherwise <br />modified (subject to any restrictions on such amendments, supplements, or modifications set forth herein), (b) any reference herein to any person shall be construed to include any person’s permitted successors and assigns, (c) the words “herein,” “hereof,” and “hereunder,” and words of similar import, shall be construed to refer to this Agreement in its entirety and not to any particular provision hereof, and (d) all references herein to articles, sections, and schedules shall <br />be construed to refer to articles and sections of, and schedules to, this Agreement. <br /> <br />Section 1.03 SURVIVAL OF TERMS. The terms of this Agreement shall end at the later <br />of: (i) completion of the Work within the Project Site, (ii) the grant of the easement outlined in Section 8.01 hereof from the Metro Flood Diversion Authority to the Utility, or (iii) substantial completion of construction under the Project Agreement. <br /> <br />ARTICLE II. PURPOSE OF AGREEMENT Section 2.01 PURPOSE. The purpose of this Agreement is to ensure a coordinated, <br />time efficient, and cost effective process for completing the Utility Location Project. <br /> Section 2.02 COORDINATION BETWEEN ENGINEERS. The Metro Flood Diversion Authority and the Utility are likely to employ the use of professional engineers for the completion of designs, plans, and Work and for the analysis and review thereof. Engineers <br />employed by the Metro Flood Diversion Authority and the Utility shall maintain open lines of <br />communication and shall coordinate and collaborate with engineers employed by other Parties described herein throughout the completion of the Utility Location Project.