Laserfiche WebLink
WP‐42F1S_Change Order 20 Page 1 of 2  <br />Change Order No. 20  <br />Date of Issuance: 01/21/2018 Effective Date: 01/21/2018  <br />Owner: Metro Flood Diversion Authority Owner's Contract No.: WP‐42F.1S  <br />Owner’s   <br />Representative:  CH2M HILL Engineers, Inc.  <br />Owner’s Representative  <br />Project No.: 435534  <br />Contractor: Industrial Builders, Inc. Contractor’s Project No.:   <br />Engineer: Houston‐Moore Group, LLC Work Package No.: WP‐42F.1S  <br />Project: Fargo‐Moorhead Area Diversion Contract Name:  <br />Flood Control, 2nd Street North, South of  <br />Pump Station  <br />The Contract is modified as follows upon execution of this Change Order:  <br />Description:  <br />1.Generator Exhaust <br />a.The installation of the back‐up generator includes the installation of 2 controllers, one <br />installed by the 2nd St. Pump Station contractor and one installed by the City Hall <br />contractor. <br />b.The additional time request is for additional coordination between the two controller <br />installation contractors, and submitting final start‐up testing reports. <br />c.Add 35 calendar days to Final Completion to allow for additional contractor <br />coordination and testing reports.DRAFT