TECHNICAL ADVISORY GROUP RECOMMENDATION
<br />TAG_CONTRACTING_RECOMMENDATION_FORM_WP-42F1S_IBI_CO-14_2016-1110 2
<br />Original
<br />Agreement or
<br />Amendment
<br />Previous Project
<br />Cost
<br />Budget ($)
<br />Change
<br />Revised Project
<br />Cost Project Start
<br />Project
<br />Completion Comments
<br />Change Order
<br />No. 7
<br />16,616,174.40 16,378.55 16,632,552.95 08-Oct-15 22-Jul-17 Tee Manhole Addition, SS-10
<br />Manhole Revision
<br />Change Order
<br />No. 8
<br />16,632,552.95 257,901.37 16,890,454.32 08-Oct-15 22-Jul-17 Differing Subsurface Conditions,
<br />floating castings
<br />Change Order
<br />No. 9
<br />16,890,454.32 (55,349.74) 16,835,104.58 08-Oct-15 22-Jul-17 Differing Subsurface Condition, Wall
<br />Penetrations, CenturyLink Concrete
<br />Removal, Furnish and Install Signal
<br />Light Pull Boxes, City Hall
<br />Construction Accommodation and
<br />Misc. Items
<br />Change Order
<br />No. 10
<br />16,835,104.58 32,505.68 16,867,610.26 08-Oct-15 22-Jul-17 Disposal of 2B Vault, Differing
<br />Subsurface Conditions – Silo Disposal
<br />in Case Plaza, and Floodwall Cap
<br />Modification
<br />Change Order
<br />No. 11
<br />16,867,610.26 52,242.85 16,919,853.11 08-Oct-15 22-Jul-17 Differing Subsurface Conditions July
<br />Removals, Repair Storm Manholes,
<br />Contaminated Soils Removal, Storm
<br />Structure ST-8 Cover, Impressioned
<br />Concrete Modifications,
<br />Administrative – Accounting Change,
<br />Administrative – Owner’s Rep and
<br />Engineer Roles and Responsibilities
<br />Change
<br />Change Order
<br />No. 12
<br />16,919,853.11 85,411.36 17,004,753.35 08-Oct-15 22-Jul-17 Differing Subsurface Conditions,
<br />Repair Storm Manholes
<br />Change Order
<br />No. 13
<br />17,004,735.35 75,899.63 17,080,652.98 08-Oct-15 22-Jul-17 Utility Vault Adjustment, 1st Ave N
<br />Bridge Spall Removal, 42A2 Pump
<br />Station Elevation Discrepancy, Flared
<br />End Section Riprap, Case Plaza
<br />Parking Lot
<br />Change Order
<br />No. 14
<br />17,080,652.98 81,816.44 17,162,469.42 08-Oct-15 22-Jul-17 Streetlight Modifications, City of
<br />Fargo Library Landscaping, Epoxy
<br />Paint, Differing Site Conditions, 3rd
<br />Street Lighting Modifications, 1st Ave
<br />Plaza Bench Modifications, Topsoil
<br />Import, and Temporary Straw Mulch
<br />DISCUSSION
<br />Change Order No. 14 adds new and modifies existing scope elements to total an increase of $81,816.44 to the
<br />Contract Price. The Change Order consists of the following items:
<br />1.Street Light Modifications – This change item includes cost for removal and reinstallation of a light
<br />pole as well as installation of lighting for the Civic Center parking lot. During construction of project
<br />features Xcel Energy needed to install temporary power poles to facilitate the work. In order to place
<br />these power poles the Contractor moved a light pole adjacent to the first Ave Bridge. Additionally,
<br />City of Fargo personnel requested lighting for the Civic Center parking lot, which recently became
<br />available for parking. At the time of bidding it was unclear whether or not this parking lot would be
<br />available due to the volume of projects in the area. The total cost for this change item is $6,991.60.
<br />HMG personnel have reviewed the cost and find it acceptable.
|