TECHNICAL ADVISORY GROUP RECOMMENDATION <br />TAG_CONTRACTING_RECOMMENDATION_FORM_WP-42F1S_IBI_CO-14_2016-1110 2 <br />Original <br />Agreement or <br />Amendment <br />Previous Project <br />Cost <br />Budget ($) <br />Change <br />Revised Project <br />Cost Project Start <br />Project <br />Completion Comments <br />Change Order <br />No. 7 <br />16,616,174.40 16,378.55 16,632,552.95 08-Oct-15 22-Jul-17 Tee Manhole Addition, SS-10 <br />Manhole Revision <br />Change Order <br />No. 8 <br />16,632,552.95 257,901.37 16,890,454.32 08-Oct-15 22-Jul-17 Differing Subsurface Conditions, <br />floating castings <br />Change Order <br />No. 9 <br />16,890,454.32 (55,349.74) 16,835,104.58 08-Oct-15 22-Jul-17 Differing Subsurface Condition, Wall <br />Penetrations, CenturyLink Concrete <br />Removal, Furnish and Install Signal <br />Light Pull Boxes, City Hall <br />Construction Accommodation and <br />Misc. Items <br />Change Order <br />No. 10 <br />16,835,104.58 32,505.68 16,867,610.26 08-Oct-15 22-Jul-17 Disposal of 2B Vault, Differing <br />Subsurface Conditions – Silo Disposal <br />in Case Plaza, and Floodwall Cap <br />Modification <br />Change Order <br />No. 11 <br />16,867,610.26 52,242.85 16,919,853.11 08-Oct-15 22-Jul-17 Differing Subsurface Conditions July <br />Removals, Repair Storm Manholes, <br />Contaminated Soils Removal, Storm <br />Structure ST-8 Cover, Impressioned <br />Concrete Modifications, <br />Administrative – Accounting Change, <br />Administrative – Owner’s Rep and <br />Engineer Roles and Responsibilities <br />Change <br />Change Order <br />No. 12 <br />16,919,853.11 85,411.36 17,004,753.35 08-Oct-15 22-Jul-17 Differing Subsurface Conditions, <br />Repair Storm Manholes <br />Change Order <br />No. 13 <br />17,004,735.35 75,899.63 17,080,652.98 08-Oct-15 22-Jul-17 Utility Vault Adjustment, 1st Ave N <br />Bridge Spall Removal, 42A2 Pump <br />Station Elevation Discrepancy, Flared <br />End Section Riprap, Case Plaza <br />Parking Lot <br />Change Order <br />No. 14 <br />17,080,652.98 81,816.44 17,162,469.42 08-Oct-15 22-Jul-17 Streetlight Modifications, City of <br />Fargo Library Landscaping, Epoxy <br />Paint, Differing Site Conditions, 3rd <br />Street Lighting Modifications, 1st Ave <br />Plaza Bench Modifications, Topsoil <br />Import, and Temporary Straw Mulch <br />DISCUSSION <br />Change Order No. 14 adds new and modifies existing scope elements to total an increase of $81,816.44 to the <br />Contract Price. The Change Order consists of the following items: <br />1.Street Light Modifications – This change item includes cost for removal and reinstallation of a light <br />pole as well as installation of lighting for the Civic Center parking lot. During construction of project <br />features Xcel Energy needed to install temporary power poles to facilitate the work. In order to place <br />these power poles the Contractor moved a light pole adjacent to the first Ave Bridge. Additionally, <br />City of Fargo personnel requested lighting for the Civic Center parking lot, which recently became <br />available for parking. At the time of bidding it was unclear whether or not this parking lot would be <br />available due to the volume of projects in the area. The total cost for this change item is $6,991.60. <br />HMG personnel have reviewed the cost and find it acceptable.