  <br />Recommended_Contracting_Actions_Summary_2016‐0714 1  <br />Recommended Contracting Actions Summary <br />Date:  July 14, 2016  <br />Description Company Budget  <br />Estimate ($)  <br />Task Order Amendments    <br />6.a.1  Task Order 10  (Utility Relocations), Amendment 8  <br /> Add Relocation Design (Allowance) and Red River Levees Utility  <br />Relocation Plan <br />Houston‐Moore  <br />Group  <br />15,500  <br />Construction Change Orders    <br />6.a.2   WP‐42F.1S (Flood Control – 2nd St. N, South of Pump  <br />Station), Change Order 09  <br /> Add differing subsurface conditions  <br /> Add floodwall utility penetrations  <br /> Add City of Fargo signal light pull boxes  <br /> Add concrete utility conduit removal  <br /> Deduct City Hall construction coordination and misc. items  <br />Industrial Builders,  <br />Inc.   <br />(55,349.74)  <br />6.a.3   WP‐42A.2 (2nd St. N Pump Station),   <br />Change Order 08  <br /> Deduct unused Hazardous Fill Removal and Disposal  <br />Industrial Builders,  <br />Inc.  <br />(47,876.36)  <br />6.a.4   WP‐42C.1 (HoJo, Shakey’s, FPS Demolition),  <br />Change Order 03  <br /> Add removal of ACM pipe  <br /> Add insulated doors  <br /> Deduct mulching   <br /> Deduct over excavation  <br /> Deduct foundation wall removal  <br />Landwehr  <br />Construction, Inc.  <br />15,109.28  <br />Third‐Party Services Agreement     <br />6.a.5  Service Agreement and Phase 2 Services Order   <br /> Phase 2 ‐ Eight year multi‐party platform electronic data  <br />management system and services to manage and store Program  <br />Records  <br />Aconex 1,322,146  <br />