07-14-2016
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2016
>
07-14-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2016 8:58:39 AM
Creation date
11/28/2018 2:35:59 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
EXHIBIT A <br />PROCEDURES AND PROTOCOLS <br />FOR THE <br />REQUEST FOR QUALIFICATIONS PHASE <br />OF THE P3 PROCUREMENT <br />by <br />the Metro Flood Diversion Authority <br />Dated as of July 14, 2016 <br />Relating to: <br />Public-Private Partnership for <br />Development and Construction of the <br />Diversion Channel and Associated Infrastructure <br />of the Fargo-Moorhead Metropolitan Area Flood Risk Management Project <br />This instrument was drafted by: Ohnstad Twichell, P.C. <br />John T. Shockley P.O. Box 458 <br />West Fargo, North Dakota 58078 DRAFT
The URL can be used to link to this page
Your browser does not support the video tag.