Hours Cost Hours Cost Hours Cost Hours Cost Hours Cost Hours Cost Hours Cost
<br />Task 2.B.3
<br />Participate in one or more partnering
<br />meetings - Assume 1 meetings 2 348$ 6 942$ 0 -$ 6 660$ -$ -$ -$ 1,950$
<br />Task 2.B.5
<br />Provide a Resident Project Representative
<br />(RPR) that will represent the Engineer and
<br />Owner's Representative. RPR will have the
<br />duties and defined in the Contract
<br />Documents for each project. - Assume 50
<br />hours per week and 11 month (47 week)
<br />construction timeline.
<br />4 696$ 40 6,280$ 376 54,896$ 2350 258,500$ -$ -$ 40 2,880$ 323,252$
<br />Task 2.B.6
<br />Provide Quality Assurance Managers and/or
<br />Project Engineers to perform general field
<br />observation and manage the specific
<br />inspections agents as needed. This
<br />includes a) Validate results of tests and
<br />inspections, oversee retesting or other
<br />actions needed to reconcile deficiencies. b)
<br />Maintain a log for each type of test
<br />conducted. c) Prepare Daily Reports and
<br />submit to Owner's Representative and City
<br />of Fargo. d) Prepare a weekly report for
<br />each project documenting the work
<br />performed by Contractor, Quality Assurance
<br />activities performed, and current issues and
<br />challenges.
<br />2 348$ 50 7,850$ 200 29,200$ 80 8,800$ -$ -$ 16 1,152$ 47,350$
<br />Task 2.B.7
<br />Respond to Requests for Information and
<br />other construction communication provided
<br />by the Owner's Representative 2 348$ 80 12,560$ 80 11,680$ 100 11,000$ -$ -$ 4 288$ 35,876$
<br />Task 2.B.8
<br />Review shop drawings, samples, and
<br />operation and maintenance manuals for
<br />conformance with the Contract Documents
<br />4 696$ 60 9,420$ 80 11,680$ 120 13,200$ -$ -$ 4 288$ 35,284$
<br />Task 2.B.9
<br />Lead development and scoping, and
<br />coordinate Contractor pricing of change
<br />Orders or other modifications that affect the
<br />design or function of the Project, and
<br />provide drafts to PMC for review and
<br />approval recommendation to Owner 2 348$ 40 6,280$ 60 8,760$ 160 17,600$ -$ -$ 16 1,152$ 34,140$
<br />Task 2.B.10
<br />Perform the following survey tasks in
<br />accordance with MFR-015, Survey
<br />Standards: a) Additional project control, if
<br />required; b) Benchmark checks during
<br />construction; c) Existing conditions surveys;
<br />d) Quantity surveys for Contractor's monthly
<br />payment application; e) As-built construction
<br />surveys.
<br />2 348$ 0 -$ 8 1,168$ 20 2,200$ 60 13,920$ 8 984$ -$ 18,620$
<br />Task 2.B.11
<br />Maintain a set of full-scale contract
<br />drawings indicating as-built conditions.
<br />Assemble redline informaiton from
<br />Contractor, Engineer's RPR, and other
<br />sources to maintain these drawings 2 348$ 8 1,256$ 40 5,840$ 140 15,400$ 0 -$ -$ -$ 22,844$
<br />Task 2.B.12
<br />Prepare or review site visit reports for site
<br />visits by Engineer, USACE or their external
<br />peer review team, or other authorities
<br />2 348$ 20 3,140$ 20 2,920$ 20 2,200$ -$ 0 -$ 8 576$ 9,184$
<br />Task 2.B.13
<br />Be responsible for commissioning activities,
<br />including equipment testing, demonstrations
<br />of capability and operability, and training of
<br />operating staff.2 348$ 4 628$ 16 2,336$ 16 1,760$ -$ 0 -$ 8 576$ 5,648$
<br />Task 2.B.14
<br />Assist Owner's Representative with
<br />determination of monthly pay application
<br />quantities.2 348$ 20 3,140$ 50 7,300$ 50 5,500$ -$ 0 -$ -$ 16,288$
<br />Task 2.B.15
<br />Identify issues on a punch list for the
<br />Contractor to resolve. Upon completion of
<br />punch list items, coordinate a final
<br />inspection. Document each inspection.2 348$ 4 628$ 20 2,920$ 25 2,750$ -$ 0 -$ -$ 6,646$
<br />Task 2.B.16
<br />Following completion of construction,
<br />update the Design Documentation Report to
<br />reflect the design changes, contract
<br />modifications, site conditions encountered,
<br />testing, and submittals 16 2,784$ 16 2,512$ 40 5,840$ 24 2,640$ -$ 24 2,952$ 16 1,152$ 17,880$
<br />Task 2.B.17
<br />Provide Final As-Built drawings in
<br />conformance with the same standards as
<br />the design drawings (WP42F1N) - 2 348$ 8 1,256$ 60 8,760$ 80 8,800$ -$ 40 4,920$ 8 576$ 24,660$
<br />Task 2.B.18
<br />Prepare a post construction Inspection and
<br />Monitoring Plan specifying annual
<br />inspections required to verify satisfactory
<br />maintenance and performance of the flood
<br />risk management features.2 348$ 20 3,140$ 40 5,840$ 20 2,200$ -$ -$ 4 288$ 11,816$
<br />Task 2.B.19
<br />Provide flood risk reduction certifications as
<br />required by owner or Diversion Authority
<br />4 696$ 24 3,768$ 40 5,840$ 16 1,760$ -$ -$ 2 144$ 12,208$
<br />Total 52 9,048$ 400 62,800$ 1130 164,980$ 3227 354,970$ 60 13,920$ 72 8,856$ 126 9,072$ 623,646$
<br />Task 2.C.1
<br />Provide project management, including
<br />monthly status reports and invoicing to
<br />Owner on Engineer's task activity -
<br />Assume11 month (47 week) construction
<br />timeline and 2 hour per month for PM
<br />and Prof. Eng.0 -$ 0 -$ 22 3,212$ 22 2,420$ -$ -$ -$ 5,632$
<br />Task 2.C.2
<br />Participate in regular and periodic meetings
<br />or teleconferences with contractors, the
<br />Owner's Representatives, Owner, and
<br />USACE - Assume 11 month (47 week)
<br />construction timeline and 3 hour per
<br />week (including prep.) for PM and Prof.
<br />Eng.
<br />0 -$ 0 -$ 141 20,586$ 141 15,510$ -$ -$ -$ 36,096$
<br />Total 0 -$ 0 -$ 163 23,798$ 163 17,930$ 0 -$ 0 -$ 0 -$ 41,728$
<br />Geotechnical Support 40,000$
<br />Technical Support - SRF 20,000$
<br />Expenses (WP42F1N)10,000$
<br />Grand Totals 52 400 1293 3390 60 72 126 735,374$
<br />GIS Technician III
<br />Senior Project
<br />Manager Project Manager
<br />Professional
<br />Engineer
<br />Graduate
<br />Engineer
<br />WP42F1North - Services During Construction (Assume a 11 month construction timeline for WP42F1North - May 1, 2016 to November 30, 2016 and April 1, 2017 to July 31, 2017)
<br />WP42F1North - Project Management
<br />FM Metro Risk Management Project
<br />Personnel Costs
<br />Cost Per TaskActivity DescriptionTask
<br />Senior
<br />Administrative2M Crew
<br />HMG Task Order No. 17 - Services During Construction
|