Laserfiche WebLink
Hours Cost Hours Cost Hours Cost Hours Cost Hours Cost Hours Cost Hours Cost <br />Task 2.B.3 <br />Participate in one or more partnering <br />meetings - Assume 1 meetings 2 348$ 6 942$ 0 -$ 6 660$ -$ -$ -$ 1,950$ <br />Task 2.B.5 <br />Provide a Resident Project Representative <br />(RPR) that will represent the Engineer and <br />Owner's Representative. RPR will have the <br />duties and defined in the Contract <br />Documents for each project. - Assume 50 <br />hours per week and 11 month (47 week) <br />construction timeline. <br />4 696$ 40 6,280$ 376 54,896$ 2350 258,500$ -$ -$ 40 2,880$ 323,252$ <br />Task 2.B.6 <br />Provide Quality Assurance Managers and/or <br />Project Engineers to perform general field <br />observation and manage the specific <br />inspections agents as needed. This <br />includes a) Validate results of tests and <br />inspections, oversee retesting or other <br />actions needed to reconcile deficiencies. b) <br />Maintain a log for each type of test <br />conducted. c) Prepare Daily Reports and <br />submit to Owner's Representative and City <br />of Fargo. d) Prepare a weekly report for <br />each project documenting the work <br />performed by Contractor, Quality Assurance <br />activities performed, and current issues and <br />challenges. <br />2 348$ 50 7,850$ 200 29,200$ 80 8,800$ -$ -$ 16 1,152$ 47,350$ <br />Task 2.B.7 <br />Respond to Requests for Information and <br />other construction communication provided <br />by the Owner's Representative 2 348$ 80 12,560$ 80 11,680$ 100 11,000$ -$ -$ 4 288$ 35,876$ <br />Task 2.B.8 <br />Review shop drawings, samples, and <br />operation and maintenance manuals for <br />conformance with the Contract Documents <br />4 696$ 60 9,420$ 80 11,680$ 120 13,200$ -$ -$ 4 288$ 35,284$ <br />Task 2.B.9 <br />Lead development and scoping, and <br />coordinate Contractor pricing of change <br />Orders or other modifications that affect the <br />design or function of the Project, and <br />provide drafts to PMC for review and <br />approval recommendation to Owner 2 348$ 40 6,280$ 60 8,760$ 160 17,600$ -$ -$ 16 1,152$ 34,140$ <br />Task 2.B.10 <br />Perform the following survey tasks in <br />accordance with MFR-015, Survey <br />Standards: a) Additional project control, if <br />required; b) Benchmark checks during <br />construction; c) Existing conditions surveys; <br />d) Quantity surveys for Contractor's monthly <br />payment application; e) As-built construction <br />surveys. <br />2 348$ 0 -$ 8 1,168$ 20 2,200$ 60 13,920$ 8 984$ -$ 18,620$ <br />Task 2.B.11 <br />Maintain a set of full-scale contract <br />drawings indicating as-built conditions. <br />Assemble redline informaiton from <br />Contractor, Engineer's RPR, and other <br />sources to maintain these drawings 2 348$ 8 1,256$ 40 5,840$ 140 15,400$ 0 -$ -$ -$ 22,844$ <br />Task 2.B.12 <br />Prepare or review site visit reports for site <br />visits by Engineer, USACE or their external <br />peer review team, or other authorities <br />2 348$ 20 3,140$ 20 2,920$ 20 2,200$ -$ 0 -$ 8 576$ 9,184$ <br />Task 2.B.13 <br />Be responsible for commissioning activities, <br />including equipment testing, demonstrations <br />of capability and operability, and training of <br />operating staff.2 348$ 4 628$ 16 2,336$ 16 1,760$ -$ 0 -$ 8 576$ 5,648$ <br />Task 2.B.14 <br />Assist Owner's Representative with <br />determination of monthly pay application <br />quantities.2 348$ 20 3,140$ 50 7,300$ 50 5,500$ -$ 0 -$ -$ 16,288$ <br />Task 2.B.15 <br />Identify issues on a punch list for the <br />Contractor to resolve. Upon completion of <br />punch list items, coordinate a final <br />inspection. Document each inspection.2 348$ 4 628$ 20 2,920$ 25 2,750$ -$ 0 -$ -$ 6,646$ <br />Task 2.B.16 <br />Following completion of construction, <br />update the Design Documentation Report to <br />reflect the design changes, contract <br />modifications, site conditions encountered, <br />testing, and submittals 16 2,784$ 16 2,512$ 40 5,840$ 24 2,640$ -$ 24 2,952$ 16 1,152$ 17,880$ <br />Task 2.B.17 <br />Provide Final As-Built drawings in <br />conformance with the same standards as <br />the design drawings (WP42F1N) - 2 348$ 8 1,256$ 60 8,760$ 80 8,800$ -$ 40 4,920$ 8 576$ 24,660$ <br />Task 2.B.18 <br />Prepare a post construction Inspection and <br />Monitoring Plan specifying annual <br />inspections required to verify satisfactory <br />maintenance and performance of the flood <br />risk management features.2 348$ 20 3,140$ 40 5,840$ 20 2,200$ -$ -$ 4 288$ 11,816$ <br />Task 2.B.19 <br />Provide flood risk reduction certifications as <br />required by owner or Diversion Authority <br />4 696$ 24 3,768$ 40 5,840$ 16 1,760$ -$ -$ 2 144$ 12,208$ <br />Total 52 9,048$ 400 62,800$ 1130 164,980$ 3227 354,970$ 60 13,920$ 72 8,856$ 126 9,072$ 623,646$ <br />Task 2.C.1 <br />Provide project management, including <br />monthly status reports and invoicing to <br />Owner on Engineer's task activity - <br />Assume11 month (47 week) construction <br />timeline and 2 hour per month for PM <br />and Prof. Eng.0 -$ 0 -$ 22 3,212$ 22 2,420$ -$ -$ -$ 5,632$ <br />Task 2.C.2 <br />Participate in regular and periodic meetings <br />or teleconferences with contractors, the <br />Owner's Representatives, Owner, and <br />USACE - Assume 11 month (47 week) <br />construction timeline and 3 hour per <br />week (including prep.) for PM and Prof. <br />Eng. <br />0 -$ 0 -$ 141 20,586$ 141 15,510$ -$ -$ -$ 36,096$ <br />Total 0 -$ 0 -$ 163 23,798$ 163 17,930$ 0 -$ 0 -$ 0 -$ 41,728$ <br />Geotechnical Support 40,000$ <br />Technical Support - SRF 20,000$ <br />Expenses (WP42F1N)10,000$ <br />Grand Totals 52 400 1293 3390 60 72 126 735,374$ <br />GIS Technician III <br />Senior Project <br />Manager Project Manager <br />Professional <br />Engineer <br />Graduate <br />Engineer <br />WP42F1North - Services During Construction (Assume a 11 month construction timeline for WP42F1North - May 1, 2016 to November 30, 2016 and April 1, 2017 to July 31, 2017) <br />WP42F1North - Project Management <br />FM Metro Risk Management Project <br />Personnel Costs <br />Cost Per TaskActivity DescriptionTask <br />Senior <br />Administrative2M Crew <br />HMG Task Order No. 17 - Services During Construction