05-26-2016
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2016
>
05-26-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2016 3:11:26 PM
Creation date
11/28/2018 2:35:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
DA‐HMG‐TO‐17‐A3_Long 4 <br />f. Punch List(s) <br />g. Updated Design Document Report <br />h. Final As‐Built Drawings <br />i. Inspection and Monitoring Plan <br />j. Flood Risk Reduction Certifications <br />B. Project Management <br />1) Provide project management, including monthly status reports and invoicing to PMC, on <br />Engineer’s task activity. <br />2) Participate in regular and periodic meetings or teleconferences with contractors, the <br />Owner’s Representative, City of Fargo, Owner, and USACE. <br />3) Deliverables: <br />a. Monthly status reports and invoices <br />C. On‐Call Services <br />1) Respond to requests for services from Owner or Owner’s Representative for tasks not <br />included in individual Task Orders. Services will be provided only with written <br />authorization from Owner or Owner’s Representative. <br />2) Deliverables: <br />a. On‐call services deliverables as requested. <br />3. Owner’s Responsibilities <br />Owner shall have those responsibilities set forth in Article 2 and in EXHIBIT B of the Agreement. <br />4. Times for Rendering Services <br />Subtask Start Time Completion Time <br />All Work <br />Amendment 2 <br />July 10, 2014 <br />January 28, 2016 <br />September 30, 2016 <br />June 30, 2017 <br />Amendment 3 May 1, 2016 July 31, 2017 <br />5. Payments to Engineer <br />A. Owner shall pay Engineer for services rendered as follows: <br />I. Compensation for services in Subtasks A, B, and C shall be on a Time and Material basis in <br />accordance with the Standard Hourly Rates shown in Exhibit C of the Agreement. <br />II. The budgets for Subtask D is an allowance. <br />B. Engineer will notify Owner when 80 percent of the budget is expended. <br />C. Engineer will submit an amendment for additional compensation when 90 percent of the budget <br />is expended, or confirm to Owner that this Task Order can be completed for the remaining <br />budget. <br />D. Engineer will not perform work beyond 100 percent of the budget without Owner’s authorization <br />by an amendment to this Task Order. <br /> DRAFT
The URL can be used to link to this page
Your browser does not support the video tag.