Laserfiche WebLink
<br /> METRO FLOOD DIVERSION PROJECT <br /> <br />AWD-00059 WP42 SDC-HMG 1 OF 2 <br />AUTHORITY WORK DIRECTIVE AWD-00059 REV-0 <br />WP-42 Services During Construction <br />   WORK TYPE: WIK  <br />TO: Houston‐Moore Group, LLC  DATE INITIATED: 5/26/2016  <br />PROJECT: Fargo‐Moorhead Diversion Engineering Design  <br />OWNER: Metro Flood Diversion Authority  <br />The following additions, deletions, or revisions to the Work have been ordered and authorized:  <br />OBJECTIVE:  <br />Add Services During Construction (SDC) scope of work for WP‐42F.1S, WP‐42H.2, and WP‐42I.1 due to change in  <br />project delivery.    <br />BACKGROUND:  <br />Houston‐Moore Group, LLC (HMG) is the Engineer of Record for the In‐Town Levees (WP‐42) work packages, and  <br />has provided Services During Bid (SDB) and Services During Construction (SDC) for WP‐42 projects from July 10,  <br />2014, to the present time.  The Diversion Authority, in consultation with HMG and CH2M, has changed the scope  <br />of work of both the HMG Services During Construction (SDC) task order and the CH2M Construction Management  <br />(CM) task order.   <br />SCOPE:  <br />The change includes transfer of the following scope from the CM task to the SDC task:   <br /> scheduling and coordination of Owner’s third party material testing firm,   <br /> preparation of daily and weekly reports,   <br /> development, scoping and negotiation of Change Orders,  <br /> field surveys,  <br /> maintenance of as‐built drawings,  <br /> preparation of site visit reports,  <br /> commissioning of facilities, and   <br /> issuing punch lists.  <br />DELIVERABLES:  <br />Deliverables include but are not limited to: daily and weekly reports, change orders, surveys, as‐built drawings,  <br />commissioning reports, and punch lists.  <br />SCHEDULE:  <br />Begin upon receipt of AWD.   <br />HOW WORK IS PERFORMED:  <br />This work will be performed on a time and material basis.  <br />  DRAFT