METRO FLOOD DIVERSION PROJECT <br /> <br /> <br />TAG CONTRACTING RECOMMENDATION FORM WP-42F1S IBI CO-06 20160425 1 <br />Technical Advisory Group Recommendation Meeting Date: 5/5/2016  <br />RECOMMENDATION FOR ACTION:  <br />The Technical advisory Group has reviewed and recommends approval of the following Contract Action(s).  <br />SUMMARY OF CONTRACTING ACTION:  <br />The Owner’s Representative has reviewed and recommends the following Contract Action(s):  <br />List description of Contract Action(s):    <br />Description <br />Budget <br />Estimate ($) <br /> <br />Industrial Builders Inc. <br />Change Order #6 89,243.21  <br />WP‐42F.1S, 2nd Street North (South of Pump Station) –modification of floodwall contract interface and incentive &  <br />disincentive changes to the Agreement  <br />  <br />Summary of Contracting History and Current Contract Action:  <br />Original  <br />Agreement or  <br />Amendment  <br />Budget ($)  <br />Change  <br />Original Project  <br />Cost  <br />Revised Project  <br />Cost Project Start <br />Project  <br />Completion Comments  <br />Original  <br />Contract  <br />$0.00 $16,184,905.85 $16,184,905.85 08‐Oct‐15 15‐Jun‐17 Contract Award recommended to  <br />lowest responsive bidder, Industrial  <br />Builders, Inc.  <br />Change Order  <br />No. 1  <br />$0.00 $16,184,905.85 $16,184,905.85 08‐Oct‐15 15‐Jul‐17 Adds 30 days to the Contract Time,  <br />revises Interim Milestone A work  <br />items, and adds an option for  <br />descoping a portion of the Work  <br />Change Order  <br />No. 2  <br />$169,490.20 $16,184,905.85 $16,354,396.05 08‐Oct‐15 15‐Jul‐17 Incorporates Work revisions to allow  <br />work around utility lines  <br />Change Order  <br />No. 3  <br />$96,806.17 $16,354,396.05 $16,451,202.22 08‐Oct‐15 15‐Jul‐17 Water main, traffic poles, traffic  <br />control plan, Milestone A scope  <br />Change Order  <br />No. 4  <br />$6,985.96 $16,451,202.22 $16,458,188.18 08‐Oct‐15 15‐Jul‐17 Bridge Lighting, concrete disposal,  <br />winter traffic control, extend 4th St  <br />signal mods requirement  <br />Change Order  <br />No. 5  <br />$68,743.01 $16,458,188.18 $16,526,931.19 08‐Oct‐15 15‐Jul‐17 Concrete grading within pump  <br />station, Unit price change, additional  <br />H Pile, bridge abutment seal, traffic  <br />signals, bridge abutment concrete  <br />disposal and floodwall connections.  <br />Change Order  <br />No. 6  <br />89,243.21 16,526,931.19 16,616,174.40 08‐Oct‐15 15‐Jul‐17 10 Feet of additional flood wall,  <br />incentive and disincentive changes  <br />to the Agreement.  <br />  <br />