05-12-2016
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2016
>
05-12-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2016 9:12:59 AM
Creation date
11/28/2018 2:35:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
METRO FLOOD DIVERSION PROJECT WORK CHANGE DIRECTIVE TO: Landwehr Construction Inc. (Nick Linnemann, Project Manager) PROJECT: Howard Johnson Demolition OWNER: Metro Flood Diversion Authority ENGINEER: Houston Moore Group OWNER'S CH2M REPRESENTATIVE: DESCRIPTION OF WORK: PROJECT NO.: WP-42C.l 002 1. Contractor is directed to abate and remove all additional pipe fittings and elbow insulation containing asbestos containing materials (ACM) in the Howard Johnson Hotel described in the Terracon sampling and testing report from March 2016 and not covered In the original abatement report. 2. Demolition of the ceiling to provide access to ACM In the hotel rooms is authorized. 3. Contractor is to ensure that Terracon and Owner's Representative can verify the quantity of fittings and elbows for determing final abatement cost. 4. Contractor ls not to exceed $109,000.00 in total additional cost to Owner without a Change Order. 5. This cost and time will be incorporated into future Change Order #1. Final amount will be based on Contractor's attached proposed change pricing. REASON FOR CHANGE(S): 1. Prior to demolition, Terracon conducted deconstructive sampling at the Howard Johnson Hotel on flooring and piping insulation in opened walls, celling, and piping spaces in March 2016. The sampling and testing has identified additional asbestos containing material (ACM) Inside the Howard Johnson Hotel that requires abatement prior to the demolition of the building. ATIACHMENTS(Ust Supporting Documents): 1. Terracon sampling and testing report 2. Contractors proposed pricing DESIGN IMPACT (Ust Impacts): Is the described change outside of the design parameters? 0 Yes / ~ No If yes, DOR and USACE signoff are required and documented below: [NorM/, P.E. ~lgntr of ~ord Date {Nome/ USACEPM Dote
The URL can be used to link to this page
Your browser does not support the video tag.