Hours Cost Hours Cost Hours Cost Hours Cost Hours Cost Hours Cost
<br />Task 2.B.3
<br />Participate in one or more partnering
<br />meetings - Assume 2 meetings 2 348$ 16 2,512$ 16 2,336$ -$ -$ -$ 5,196$
<br />Task 2.B.5
<br />Provide a Resident Project Representative
<br />(RPR) that will represent the Engineer and
<br />Owner's Representative. RPR will have the
<br />duties and defined in the Contract
<br />Documents for each project. Observe
<br />construction in sufficient detail to certify the
<br />flood risk reduction features of the Project.
<br />Prepare site visit reports and submit to
<br />Owner's Representative. - Assume 50
<br />hours per week and 11 month (47 week)
<br />construction timeline.
<br />4 696$ 8 1,256$ 376 54,896$ 2350 258,500$ -$ 40 2,880$ 318,228$
<br />Task 2.B.6
<br />Respond to Requests for Information and
<br />other construction communication provided
<br />by the Owner's Representative 2 348$ 8 1,256$ 120 17,520$ 80 8,800$ -$ 2 144$ 28,068$
<br />Task 2.B.7
<br />Review shop drawings, samples, and
<br />operation and maintenance manuals for
<br />conformance with the Contract Documents
<br />4 696$ 20 3,140$ 80 11,680$ 40 4,400$ -$ 2 144$ 20,060$
<br />Task 2.B.8
<br />Review and approve change orders or
<br />modifications that could affect the design or
<br />function of the Project 2 348$ 8 1,256$ 40 5,840$ 20 2,200$ -$ 8 576$ 10,220$
<br />Task 2.B.9
<br />Update monthly the As-Built drawings based
<br />on information provided by Owner's
<br />Representative - Assume no field survey
<br />will be completed by HMG 2 348$ 8 1,256$ 80 11,680$ 80 8,800$ -$ -$ 22,084$
<br />Task 2.B.10
<br />Assist Owner's Representative with
<br />determination of monthly pay application
<br />quantities based on survey information
<br />provided by Owner's Representative -
<br />Assume no field survey will be completed byHMG.2 348$ 4 628$ 50 7,300$ 50 5,500$ 20 2,460$ -$ 16,236$
<br />Task 2.B.11
<br />Following completion of construction, update
<br />the Design Documentation Report to reflect
<br />the design changes, contract modifications,
<br />site conditions encountered, testing, and
<br />submittals 16 2,784$ 16 2,512$ 40 5,840$ 24 2,640$ 24 2,952$ 16 1,152$ 17,880$
<br />Task 2.B.12
<br />Provide Final As-Built drawings in
<br />conformance with the same standards as the
<br />design drawings (WP42F1N) - Assume no
<br />field survey will be completed byHMG.
<br />2 348$ 8 1,256$ 60 8,760$ 80 8,800$ 40 4,920$ 8 576$ 24,660$
<br />Task 2.B.13
<br />Prepare a post construction Inspection and
<br />Monitoring Plan specifying annual
<br />inspections required to verify satisfactory
<br />maintenance and performance of the flood
<br />risk management features.
<br />2 348$ 20 3,140$ 40 5,840$ 20 2,200$ -$ 4 288$ 11,816$
<br />Task 2.B.14
<br />Provide flood risk reduction certifications as
<br />required by owner or Diversion Authority
<br />4 696$ 24 3,768$ 40 5,840$ 16 1,760$ -$ 2 144$ 12,208$
<br />Total 42 7,308$ 140 21,980$ 942 137,532$ 2760 303,600$ 84 10,332$ 82 5,904$ 486,656$
<br />Task 2.C.1
<br />Provide project management, including
<br />monthly status reports and invoicing to
<br />Owner on Engineer's task activity -
<br />Assume11 month (47 week) construction
<br />timeline and 2 hour per month for PM and
<br />Prof. Eng.0 -$ 22 3,454$ 22 3,212$ -$ -$ -$ 6,666$
<br />Task 2.C.2
<br />Participate in regular and periodic meetings
<br />or teleconferences with contractors, the
<br />Owner's Representatives, Owner, and
<br />USACE - Assume 11 month (47 week)
<br />construction timeline and 3 hour per
<br />week (including prep.) for PM and Prof.
<br />Eng.
<br />0 -$ 141 22,137$ 141 20,586$ -$ -$ -$ 42,723$
<br />Total 0 -$ 163 25,591$ 163 23,798$ 0 -$ 0 -$ 0 -$ 49,389$
<br />Geotechnical Support 40,000$ Technical Support - SRF 20,000$ Expenses (WP42F1N)10,000$
<br />Grand Totals 42 303 1105 2760 84 82 606,045$
<br />FM Metro Risk Management Project
<br />Personnel Costs
<br />Cost Per TaskActivity DescriptionTask
<br />Senior
<br />AdministrativeGIS Technician III
<br />Senior Project
<br />Manager
<br />HMG Task Order No. 17 - Services During Construction
<br />Project Manager
<br />Professional
<br />Engineer
<br />Graduate
<br />Engineer
<br />WP42F1North - Services During Construction (Assume a 11 month construction timeline for WP42F1North - May 1, 2016 to November 30, 2016 and April 1, 2017 to July 31, 2017)
<br />WP42F1North - Project Management
|