Hours Cost Hours Cost Hours Cost Hours Cost Hours Cost Hours Cost <br />Task 2.B.3 <br />Participate in one or more partnering <br />meetings - Assume 2 meetings 2 348$ 16 2,512$ 16 2,336$ -$ -$ -$ 5,196$ <br />Task 2.B.5 <br />Provide a Resident Project Representative <br />(RPR) that will represent the Engineer and <br />Owner's Representative. RPR will have the <br />duties and defined in the Contract <br />Documents for each project. Observe <br />construction in sufficient detail to certify the <br />flood risk reduction features of the Project. <br />Prepare site visit reports and submit to <br />Owner's Representative. - Assume 50 <br />hours per week and 11 month (47 week) <br />construction timeline. <br />4 696$ 8 1,256$ 376 54,896$ 2350 258,500$ -$ 40 2,880$ 318,228$ <br />Task 2.B.6 <br />Respond to Requests for Information and <br />other construction communication provided <br />by the Owner's Representative 2 348$ 8 1,256$ 120 17,520$ 80 8,800$ -$ 2 144$ 28,068$ <br />Task 2.B.7 <br />Review shop drawings, samples, and <br />operation and maintenance manuals for <br />conformance with the Contract Documents <br />4 696$ 20 3,140$ 80 11,680$ 40 4,400$ -$ 2 144$ 20,060$ <br />Task 2.B.8 <br />Review and approve change orders or <br />modifications that could affect the design or <br />function of the Project 2 348$ 8 1,256$ 40 5,840$ 20 2,200$ -$ 8 576$ 10,220$ <br />Task 2.B.9 <br />Update monthly the As-Built drawings based <br />on information provided by Owner's <br />Representative - Assume no field survey <br />will be completed by HMG 2 348$ 8 1,256$ 80 11,680$ 80 8,800$ -$ -$ 22,084$ <br />Task 2.B.10 <br />Assist Owner's Representative with <br />determination of monthly pay application <br />quantities based on survey information <br />provided by Owner's Representative - <br />Assume no field survey will be completed byHMG.2 348$ 4 628$ 50 7,300$ 50 5,500$ 20 2,460$ -$ 16,236$ <br />Task 2.B.11 <br />Following completion of construction, update <br />the Design Documentation Report to reflect <br />the design changes, contract modifications, <br />site conditions encountered, testing, and <br />submittals 16 2,784$ 16 2,512$ 40 5,840$ 24 2,640$ 24 2,952$ 16 1,152$ 17,880$ <br />Task 2.B.12 <br />Provide Final As-Built drawings in <br />conformance with the same standards as the <br />design drawings (WP42F1N) - Assume no <br />field survey will be completed byHMG. <br />2 348$ 8 1,256$ 60 8,760$ 80 8,800$ 40 4,920$ 8 576$ 24,660$ <br />Task 2.B.13 <br />Prepare a post construction Inspection and <br />Monitoring Plan specifying annual <br />inspections required to verify satisfactory <br />maintenance and performance of the flood <br />risk management features. <br />2 348$ 20 3,140$ 40 5,840$ 20 2,200$ -$ 4 288$ 11,816$ <br />Task 2.B.14 <br />Provide flood risk reduction certifications as <br />required by owner or Diversion Authority <br />4 696$ 24 3,768$ 40 5,840$ 16 1,760$ -$ 2 144$ 12,208$ <br />Total 42 7,308$ 140 21,980$ 942 137,532$ 2760 303,600$ 84 10,332$ 82 5,904$ 486,656$ <br />Task 2.C.1 <br />Provide project management, including <br />monthly status reports and invoicing to <br />Owner on Engineer's task activity - <br />Assume11 month (47 week) construction <br />timeline and 2 hour per month for PM and <br />Prof. Eng.0 -$ 22 3,454$ 22 3,212$ -$ -$ -$ 6,666$ <br />Task 2.C.2 <br />Participate in regular and periodic meetings <br />or teleconferences with contractors, the <br />Owner's Representatives, Owner, and <br />USACE - Assume 11 month (47 week) <br />construction timeline and 3 hour per <br />week (including prep.) for PM and Prof. <br />Eng. <br />0 -$ 141 22,137$ 141 20,586$ -$ -$ -$ 42,723$ <br />Total 0 -$ 163 25,591$ 163 23,798$ 0 -$ 0 -$ 0 -$ 49,389$ <br />Geotechnical Support 40,000$ Technical Support - SRF 20,000$ Expenses (WP42F1N)10,000$ <br />Grand Totals 42 303 1105 2760 84 82 606,045$ <br />FM Metro Risk Management Project <br />Personnel Costs <br />Cost Per TaskActivity DescriptionTask <br />Senior <br />AdministrativeGIS Technician III <br />Senior Project <br />Manager <br />HMG Task Order No. 17 - Services During Construction <br />Project Manager <br />Professional <br />Engineer <br />Graduate <br />Engineer <br />WP42F1North - Services During Construction (Assume a 11 month construction timeline for WP42F1North - May 1, 2016 to November 30, 2016 and April 1, 2017 to July 31, 2017) <br />WP42F1North - Project Management