05-12-2016
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2016
>
05-12-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2016 9:12:59 AM
Creation date
11/28/2018 2:35:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> METRO FLOOD DIVERSION PROJECT <br /> <br />WP-42F.2 SERVICES DURING BIDDING 1 OF 2 <br />AUTHORITY WORK DIRECTIVE AWD-00058 REV-0 <br />WP-42F.1N SDC and WP-42F.2 SDB <br /> WORK TYPE: WIK <br />TO: Houston‐Moore Group, LLC DATE INITIATED: 5/4/2015 <br />PROJECT: Fargo‐Moorhead Diversion Engineering Design <br />OWNER: Metro Flood Diversion Authority <br />The following additions, deletions, or revisions to the Work have been ordered and authorized: <br />OBJECTIVE: <br />Initiate Services During Construction (SDC) for WP‐42F.1N and Services During Bid (SDB) for WP‐42F.2, both <br />projects are schedule to start in May 2016. <br />BACKGROUND: <br />Houston‐Moore Group, LLC (HMG) is the Engineer of Record for the In‐Town Levees (WP‐42) work packages, and <br />has provided Services During Bid (SDB) and Services During Construction (SDC) for WP‐42 projects from July 10, <br />2014, to the present time. An amendment to Task Order 17 for these services is currently being negotiated but <br />will not be completed prior to the start of these construction projects. <br />SCOPE: <br />WP‐42F.1N – SDC services. Work includes participation in pre‐construction meeting, partnering session, review of <br />preliminary construction submittals, and field inspections. Estimated cost of proposed services is $30,000. <br />WP‐42F.2 – SDB services. Work includes participation pre‐bid meeting, respond to bidder questions, prepare <br />technical addenda, attend the bid opening, and review of bids. Estimated cost of proposed services is $15,000. <br />DELIVERABLES: <br />WP‐42F.1N – SDC services: submittal review comments, field inspection notes/reports. <br />WP‐42F.2 – SDB services: bidder question responses, addenda items. <br />SCHEDULE: <br />Begin upon receipt of AWD. <br />HOW WORK IS PERFORMED: <br />This work will be performed on a time and material basis. <br />COST: <br />Cost incurred under this AWD shall not exceed $45,000, allocated as $30,000 for WP‐42F.1N and $15,000 for WP‐ <br />42F.2, without further written approval. The above scope of work will be incorporated into a future Task Order No. <br />17 amendment, which will supersede this AWD. Costs associated with this AWD will be invoiced under Task Order <br />17 after the amendment has been executed. <br />REASON FOR CHANGE(S): <br />Extended negotiation period for Task Order 17 amendment. <br /> DRAFT
The URL can be used to link to this page
Your browser does not support the video tag.