03-31-2016
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2016
>
03-31-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2016 4:29:28 PM
Creation date
11/28/2018 2:35:52 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Changes since 2012 Estimate –In Town Levees <br />2012 Estimate -$38M 2016 Estimate -$152M <br />Primary Reason: USACE Risk and Reliability “Freeboard” <br />Requirements <br />Land Increased $26M <br />Residential increased from $1M to $7M <br />Number of homes increased from 3 to 15 due to adding El Zagal and <br />Mickelson to project <br />Commercial lands increased from $14M to $34M <br />Geotechnical requirements for the 2nd St flood wall resulted in <br />additional property needs <br />Appraisals and relocation requirements resulted <br />in additional property needs15
The URL can be used to link to this page
Your browser does not support the video tag.