03-31-2016
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2016
>
03-31-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2016 4:29:28 PM
Creation date
11/28/2018 2:35:52 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Cost Estimate -Basis <br />CCI-CH2M HILL Constructors, Inc. <br />Bottom-up estimate in 2012 <br />Accounted for Post-Feasibility Changes <br />Independent estimate from the Corps <br />Used combination of proprietary tools and Timberline® <br />estimating software <br />Used some estimates from HMG and others <br />Estimated “soft costs” as percents of construction <br />Updated the estimate in late 2015/early 2016 <br />10
The URL can be used to link to this page
Your browser does not support the video tag.