02-25-2016
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2016
>
02-25-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2016 8:39:12 AM
Creation date
11/28/2018 2:35:50 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Recommended Contracting Actions Summary <br />Date: February 25, 2016 <br />Description Company Budget <br />Estimate ($) <br />Construction Contract Awards <br />WP-42H.2 - El Zagal Area Flood Risk Management – Phase 2 <br />• Recommendation of Award for constructing approximately 1,000 linear <br />feet of earthen levee and flood wall, temporary floodwall closure, <br />1 Gatewell structure, 8 residential demolitions with landscape removal, <br />Sanitary Lift Station, 550 feet of Storm Sewer, 500 feet of Sanitary <br />Sewer, and other components. <br />Reiner Contracting, <br />Inc. <br />1,515,798.64 <br />WP-42I.1 Mickelson Levee Extension <br />• Recommendation of Award for constructing an earthen levee, road <br />reconstruction, and underground utility relocation. <br />Industrial Builders, <br />Inc. <br />659,910.00 <br /> <br />Recommended_Contracting_Actions_Summary_2016-0225.docx 1
The URL can be used to link to this page
Your browser does not support the video tag.