Laserfiche WebLink
TECHNICAL STAFF RECOMMENDATION <br /> <br />TS CONTRACTING RECOMMENDATION_MFDA-HMG-TO08A12_20160202 3 <br />DISCUSSION:  <br />E.VII Cemetery Assessment Team Support:  <br />The USACE with support from the Local Sponsors, including HMG staff, completed a draft Cemetery Mitigation  <br />Plan in June 2015 from project impacted cemeteries.  Work is planned for 2016 to further advance cemetery  <br />mitigation with planned meetings and discussion with cemetery representatives.  This amendment provides scope  <br />and budget to prepare for and attend meetings with cemetery representatives.  <br />  <br />E.X Baseline Streambank Erosion Evaluation:  <br />The level of effort to complete the baseline streambank erosion evaluation exceeded the planned budget due to  <br />having to make multiple data requests/retrievals to collect the required data.  This necessitated an interactive  <br />approach for the analysis of the data.  The original task budget was $210,000 and this request for an additional  <br />$9,440 is approximately 4.5% of the original budget.  <br />  <br />TO08 Work‐in‐Kind Budgets by Work Package:  <br />Subtask Activity ID Current Budget  <br />($)  <br />Amendment 12  <br />($) Total ($)  <br />A. Meander Belt Width Analyses SW‐1010 307,203 0  307,203.00 <br />B. Identification and Assessment of Tie‐ <br />Back Levees  <br />SW‐1040 45,089.96 0  45,089.96 <br />C. EMB Openings (Allowance) SW‐1040 39,989 0  39,989.00 <br />D. Diversion Inlet Gates (Allowance) SW‐1040 55,418 0  55,418.00 <br />E. On‐Call Services ($250,000 Allowance) SW‐1040 76,338.95 0 76,338.95 <br />E.I. Maximum Project Design Flows SW‐6130 13,658 0  13,658.00 <br />E.II. Local Drainage Plan SW‐1060 9,978 0  9,978.00 <br />E.III. Reach 1 LFC Meander Modeling SW‐1010 9,693 0  9,693.00 <br />E.IV. Geomorphology Consulting SW‐1390 16,804.34 0  16,804.34 <br />E.V. MN EIS Scoping Document  <br />Comment Support  <br />SW‐6180 8,502.75 0  8,502.75 <br />E.VI. MN EIS Preparation Support SW‐1142 416,000 0  416,000.00 <br />E.VII. Cemetery Assessment Team  <br />Support  <br />SW‐1410 85,000 24,750  109,750.00 <br />E.VIII. Large Structure Team Support SW‐6110 50,000 0  50,000.00 <br />E.IX. Hydraulic Structures Aesthetics  <br />Evaluation  <br />SW‐6200 54,000 0  54,000.00 <br />E.X. Baseline Stream Bank Erosion  <br />Evaluation  <br />SW‐1390 210,000 9,440  219,440.00 <br />E.XI. LFC Modeling: Maple River to  <br />Diversion Inlet  <br />SW‐6170 81,000 0  81,000.00 <br />TOTAL 1,478,675 34,190 1,512,865 <br />  <br />  <br />